HyreRemodel

Compare

HomeAdvisor vs Angi: Which One Fits Your Project

They are not rivals: one company owns both. What matters is how the request reaches a contractor, and what you check after.

Updated August 16, 2026

Plan Your Remodel What it costs

Written by HyreRemodel Research Desk Primary-source research and fact checking

The short answer

HomeAdvisor vs Angi is not a choice between two companies. Angi Inc.’s annual report says it operates under brands including Angi, HomeAdvisor and Handy, and that in its ads and leads business professionals pay for connections to consumers.

Its Services business also offers some jobs at a pre-set price paid through the platform. Whichever brand you use, the contractor who calls is an independent business, so check its license, insurance and references yourself.

What should you know about HomeAdvisor and Angi?

One owner

Angi Inc. lists Angi and HomeAdvisor as its brands; Angie’s List became Angi in 2021.

Pros pay for connections

That is the model the company describes in its 10-K.

You still vet the contractor

The platform connects; it does not do the work.

How do HomeAdvisor and Angi compare?

From Angi Inc.’s FY2024 annual report and the FTC. No ratings or reviews are used.

Compared onHomeAdvisorAngi
OwnerAngi Inc.Angi Inc.
How pros payFor connections to consumers (ads and leads)The same ads and leads business; the filing does not split it by brand
Pre-priced jobsNot described for this brand in the filingThe company’s Services business: some jobs at a set price paid through the platform
Regulatory historyFTC final order, 2023, on how it marketed leads to prosNot named in that order
Who does the workAn independent contractorAn independent contractor

Angi Inc. became independent of IAC on April 1, 2025.

When HomeAdvisor fits

You want several businesses to contact you

Its model is connecting a request with paying pros.

The job is defined

A clear scope makes callbacks comparable.

You are ready to vet each caller

With the steps in choosing a contractor.

You want to compare several callers quickly

Prepare one scope and give it to each.

When Angi fits

A small, standard job with a set price

The company’s Services business offers pre-priced tasks.

You want to browse profiles first

Under the same parent company.

You still check the license

On your state board’s site.

You prefer a set price for a small task

Read what the pre-priced job includes and excludes.

The platform is not the decision. The contractor is.

Whichever brand puts you in touch, compare written scopes, license and insurance, and contract terms before you sign. A remodel needs the same checks however the contractor found you.

Compare quotes side by side

What to ask any contractor who calls

What is your license number?

Check it with the state board.

Can I see your certificate of insurance?

Liability and workers’ comp.

Who will be on site?

Your crew or subcontractors.

Will you put the scope and schedule in writing?

See remodeling contracts.

Who pulls the permit?

What to have ready before you submit a request

A one-page scope

What you want done, the rooms involved and any must-haves.

Your timing

When you want work to start and any hard dates.

How you want to be contacted

Callbacks can come from several businesses.

Your state board’s license lookup

Bookmark it to check each caller.

Where this goes wrong

Treating a platform listing as a license check

Verify with your state yourself.

Comparing bids for different scopes

Send each one the same written description.

Paying a large deposit to the first caller

Ask your state contractor board what deposit rules apply.

Your inquiry

Tell us about the remodel

Nothing goes to a remodeling contractor unless you agree.

Free, with no obligation: a person at HyreRemodel reads your request and replies by email. Matching with remodeling contractors is not live yet, so this is not a quote, and nothing goes to a contractor unless you agree.

Plan Your Remodel

One short form: your address and how to reach you. A person at HyreRemodel reads it and replies.

Your details

We reply to every inquiry. Nothing is passed on to anyone you have not asked us to contact.

Questions

Do I pay to use HomeAdvisor or Angi?
Angi Inc. describes its revenue as coming mainly from service professionals, plus payments for pre-priced jobs in its Services business. Read the current terms on the site you use.
Are HomeAdvisor and Angi the same company?
Yes. Angi Inc.’s annual report lists Angi, HomeAdvisor and Handy as its brands. The company took the name Angi Inc. in March 2021, moving its marketing from Angie’s List to the Angi brand.
How do HomeAdvisor and Angi make money?
Per Angi Inc.’s 10-K, professionals pay for connections to consumers and buy memberships and advertising. Its Services business takes payment for pre-priced jobs and passes a portion to the pro.
What was the FTC case against HomeAdvisor?
In 2023 the FTC finalized an order requiring HomeAdvisor to pay up to $7.2 million and stop misrepresenting the leads it sold to service providers. HomeAdvisor did not admit wrongdoing.
Do these platforms do the remodeling?
No. The contractor is an independent business. Check its license and insurance yourself.
Is HyreRemodel part of Angi?
No. HyreRemodel has no tie to Angi Inc. HyreRemodel also takes project details through its own form, so we have our own stake; this page uses only public filings and the FTC record.

Written and audited by

HyreRemodel Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a remodeling contractor and not a sales floor.

We read the statute, the licensing register or the municipal fee schedule ourselves, and we publish the figure with the document it came from and the date we retrieved it.

Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify.

This program is new, and the counts below are small: they are what we have actually published, not what we intend to.

7
studies published
7
states in the contractor store we measure against
264
source documents linked from these pages, 101 of them on .gov domains
22,183
license records measured September 5, 2026

How this desk works

  • Primary sources only. Licensing facts come from the issuing board or the statute that creates the credential. Permit-fee facts come from the municipality that publishes the schedule. We do not cite an article that cites a source; we open the source and record the date.
  • Our own store is titled to the states it covers. We hold verified contractor records for seven states. An asset that rests on those records is titled to those states. National claims rest on federal or state-agency data (Census, BLS, EPA), never on our counts.
  • Absence of a record is not a finding about the company. A board that does not publish disciplinary history in a form we retrieved is excluded from any “clean record” claim. Unable to verify is not unlicensed. Not required is not not carried.
  • Fact, calculation, analysis and recommendation stay labelled. A statute is a source fact. A count we derived from our store is a HyreRemodel calculation. What that count means is analysis. What a homeowner should do next is a recommendation.
  • We do not remodel homes, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.

Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

Angi Inc. Form 10-K for fiscal year 2024, U.S. Securities and Exchange Commission (EDGAR). Retrieved October 22, 2026.
HomeAdvisor matter, case 192-3106, Federal Trade Commission. Retrieved October 22, 2026.

Information on this page is general and may vary by location, building code, zoning, the condition of your house and your own circumstances. It is not legal, design or engineering advice.

HyreRemodel is not a remodeling contractor: we do not design, build or manage remodeling work, and we do not supervise or warrant it. This page explains the work so you can judge a proposal and a contractor.