HyreRemodel

HyreRemodel tools

Remodeling calculators

Twenty-one tools for pricing a room, deciding whether to remodel, buying and paying for the work, checking a layout and measuring materials. Each shows its arithmetic and sources; none asks for an email.

Pre-1978 homes: paint work above the RRP limits needs a certified firm US EPA, Lead Renovation, Repair and Painting rule (40 CFR Part 745, Subpart E), retrieved September 5, 2026: more than 6 sq ft per room inside or 20 sq ft outside, or any window replacement.

Pick the tool by the decision in front of you. Pricing a room: the kitchen, bathroom, countertop and flooring calculators. Deciding whether to remodel: remodeling ROI, remodel vs move and the whole-home budget.

Buying the work: the quote comparison worksheet, the permit checker and the timeline planner. Paying for it: the loan payment, contingency and deposit limit tools. Then the layout planners and the material quantity calculators.

Before any wall, floor or ceiling comes out

Built before 1978? Paid work that disturbs more than 6 sq ft of paint per room inside, 20 sq ft outside, or replaces any window needs an EPA Lead-Safe Certified firm.

Old flooring, ceilings and insulation. These can contain asbestos. Have them tested before demolition.

Walls, gas and wiring. A load-bearing wall needs a sized beam and a permit. Gas lines and panel work are licensed, permitted trades.

Pricing a room

Survey bands named and dated beside the box, or the rate from your own bid.

Deciding whether to remodel

What comes back at resale, what moving would cost, and what the whole house adds up to.

Buying the work

Comparable bids, the permit question and a realistic calendar.

Paying for the work

A loan payment, a reserve for surprises, and whether a deposit is over your state’s legal cap.

Checking a layout

Clearances and stair dimensions checked against named code and guidelines before anything is ordered.

Measuring materials

Quantities to order, from your own measurements. No prices: you add those from the store or the bid.

Which tool answers which question

ToolThe question it answersWhat it will not do
Kitchen remodel costDoes this kitchen bid add up?Publish a national kitchen price.
Bathroom remodel costWhat range should this bathroom fall in?Price moving a toilet for you.
Countertop calculatorHow many square feet, and at what rate?Count slabs for your layout.
Flooring calculatorHow much flooring do I order?Supply a price per square foot.
Remodeling ROIHow much comes back at resale?Apply a survey percentage to your house.
Remodel vs moveIs staying cheaper than changing houses?Assume a commission or forecast prices.
Whole-home budgetWhat might the whole house cost?See what is behind your walls.
Quote comparisonIs this bid complete?Rate the contractor or the price.
Permit checkerHow does the model code treat this work?Rule on your project.
Timeline plannerHow many weeks, start to finish?Promise a finish date.
Remodel loan paymentWhat will this loan cost each month?Quote you a rate.
Remodel contingencyHow much should I hold back?Tell you the right percentage.
Deposit limit checkerIs this deposit over my state’s cap?Give legal advice on your contract.
Kitchen layout plannerDo my triangle and aisles meet the guidelines?Design the kitchen.
Bathroom layout plannerDoes the toilet have its code clearances?Approve the plan for your inspector.
Stair calculatorHow many risers, and how long is the run?Replace a framer or a permit.
Tile square footageHow much tile do I order?Price the tile.
Backsplash calculatorHow much backsplash tile do I order?Price the tile.
Drywall calculatorHow many sheets do I need?Price the board or the labor.
Paint coverageHow many gallons do I buy?Price the paint.
Insulation calculatorWhat R-value, and how many bags?Check your local energy code.

How these tools work

  • The arithmetic is on the page

    Each tool states its formula, and every fixed figure names its source and the date it was read.

  • Nothing is stored or emailed

    The tools run in your browser. No email is asked for.

  • No invented prices

    HyreRemodel holds no dataset of remodeling bids. A default comes from a named survey, dated beside the box, or starts at 0.

  • Surveys are labeled as surveys

    Cost vs Value’s resale figures are estimates by surveyed real-estate professionals, not sale prices.

  • Not a quote, a design or a permit

    HyreRemodel does no remodeling work. A contractor’s bid and your building department decide the job.

Questions about these tools

Are these remodeling calculators free?
Yes. All 21 run in your browser, show their arithmetic and ask for no email. Nothing you type is stored.
Why do some price boxes start at $0?
HyreRemodel holds no dataset of remodeling bids. Where a named survey publishes a band, such as HomeGuide’s, the tool uses it and dates it beside the box. Everywhere else, you type the figure from your bid.
Which remodeling projects recoup the most at resale?
In Zonda’s 2025 Cost vs Value survey, four of the top five were outside projects, led by garage door replacement. A midrange minor kitchen, at 112.9%, was the only inside project. These are survey estimates, not sale prices.
How much contingency should I hold?
That is your call, and the boxes start at 0. A contingency is money you hold outside the contract for what opening the walls finds. Older houses can hide more.
Do I need a permit to remodel?
Finish work such as paint, tile, cabinets and countertops is exempt under the model code. Moving plumbing, new circuits, gas work and structural changes need a permit. The permit checker explains each; your building department decides.
Why does the remodel vs move tool have no commission rate?
Since August 17, 2024, offers of buyer-agent pay can no longer be published on an MLS and are negotiated separately. A fixed rate would be a guess, so you type the one on your listing agreement.
Does HyreRemodel do remodeling work?
No. HyreRemodel does not design, build, manage or inspect remodeling work, and does not rank contractors. The tools help you understand a project and check a bid.

Sources and methodology

Figures dated September 29, 2026. Last reviewed .

Related

Plan Your Remodel Back to the home page