Legal
Terms of use
HyreRemodel publishes remodeling information and does no remodeling work. Nothing here is professional advice. These are the plain terms for a site that publishes guidance and, in future, will introduce homeowners to remodeling professionals.
What this site is
HyreRemodel publishes educational information about home remodeling for homeowners in the United States. HyreRemodel is not a contractor and does not perform, supervise, inspect, warrant or finance remodeling work. It does not produce designs or drawings, apply for permits, or send anyone to your home.
Not professional advice
Nothing on this site is financial, legal, insurance or engineering advice, and it is not a substitute for a licensed professional assessing your specific property. Conditions, codes, licensing rules and prices vary by state, county and property. Verify anything you intend to rely on with the primary source and with a qualified professional.
Accuracy and dates
We source factual claims to government agencies, model codes, state and local rules, trade standards bodies and published research, and we date material that is time-sensitive. Rules and prices still change.
Where a page carries a “retrieved”, “checked” or “updated” date, that is the date the claim was last checked, not a promise it is still current when you read it.
Third-party links
We link to external sources so you can check our work. We do not control those sites and are not responsible for their content or privacy practices.
Introductions to companies
HyreRemodel intends to introduce homeowners to remodeling professionals and to be paid for doing so. Any such relationship will be disclosed where it applies. An introduction is not an endorsement, a recommendation or a warranty of any company’s work, and any contract you sign is between you and that company.
Acceptable use
Please do not:
- scrape, republish or resell the content here without permission;
- attempt to disrupt, overload or gain unauthorized access to the site;
- submit the form with someone else’s details.
Liability
The site is provided “as is”. To the extent permitted by law, HyreRemodel is not liable for losses arising from decisions made on the basis of information published here.
Contact
Questions about these terms: call (866) 582-8523, or write to HyreRemodel, 6975 Union Park Avenue, Midvale, UT 84047, United States.
You can also email hello@hyreremodel.com. The contact page lists every way to reach us.