Legal
Privacy policy
Short version: we collect what you type into the form, we do not sell it, and we will tell you before passing it to anyone.
What we collect
If you submit an inquiry form, we receive:
- Your name, so we know who we are replying to;
- Your email address, as the reply route;
- Your zip code, to work out which state and local rules apply and, once matching opens, which contractors work there;
- Project details: the kind of project, your timing, the kind of home and whether you own, rent or manage it, where you are in the process, anything you choose to write and, if you say, how you heard about us;
- Your street address and phone number, so we can reply about the right property and call back if you ask us to;
- Details about the visit: every form submission also includes the page it was sent from, the referral source (the referring site or campaign tags in the link), and basic browser and device details (browser, operating system, device type, screen size, language and time zone).
That is the only personal information this site asks for. There is no account to create.
The address box offers suggestions as you type. Those come from Photon, a public address-lookup service run by komoot. Producing them means what you have typed so far is sent to komoot as you type, before you submit, and whether or not you ever submit.
If you would rather that did not happen, leave the address box empty. The zip code is the only location we actually need, and the rest of the form works exactly the same without it.
We use Google Analytics to understand which parts of the page people read. It records page views and interactions in aggregate. We also use Microsoft Clarity, which records how the page is used (clicks, scrolling and mouse movement) and replays those sessions to us. Form fields are masked, so what you type is not captured.
Who processes it
Form submissions are posted to this site. We store each one in a Cloudflare database and send a copy by email to the publisher from the server. Address suggestions in the form come from Photon, run by komoot, which receives what you type into the address box in order to return matches.
The site is served as static files from Cloudflare, which processes standard request logs, including IP addresses, for security and delivery purposes.
What we do with it
We use your details to reply to you and to tell you when remodeling matching opens in your area. HyreRemodel expects to earn revenue in future by connecting homeowners with remodeling professionals. We will not pass your details to a company without telling you first and getting your agreement. We do not sell personal information.
How long we keep it
Inquiries stay in our inbox until they are no longer useful to answer. Ask us to delete yours and we will, and we will confirm when it is done.
Your choices
To see what we hold about you, correct it, or have it deleted, contact us using the details below. Depending on where you live you may have additional rights under laws such as the California Consumer Privacy Act; we apply the same handling to everyone regardless.
To make a request: call (866) 582-8523, or write to HyreRemodel, 6975 Union Park Avenue, Midvale, UT 84047, United States.
You can also email hello@hyreremodel.com. The contact page lists every way to reach us.
Calls and texts (TCPA)
The inquiry form asks for a phone number and, beside it, has an optional consent box. Giving a number is not consent to be called: leaving the box unchecked means we will not call or text you about it.
Checking that box is express written consent under the Telephone Consumer Protection Act. It means HyreRemodel may call and text the number you gave, including with an autodialer, an artificial or prerecorded voice, and SMS, about your inquiry.
It is not a condition of using this site or of anything we provide, and we do not pass the number to anyone else on the strength of it.
You can withdraw it whenever you like: reply STOP to any text, call (866) 582-8523, or write to HyreRemodel, 6975 Union Park Avenue, Midvale, UT 84047, United States.
Standard message and data rates from your carrier may apply. We keep a record of when consent was given and when it was withdrawn, because we have to be able to show which one applies.
Children
The site is intended for homeowners and is not directed at children under 13.
Changes
If this policy changes materially, the date at the top of the page changes and the previous version is superseded from that date.