Contact
Contact HyreRemodel
To reach HyreRemodel, email hello@hyreremodel.com or call (866) 582-8523. We answer questions about the site, corrections, privacy requests and which kind of remodel fits your problem. We cannot price a project or send anyone, because HyreRemodel is not a remodeling contractor.
Damage happening now? Do not wait on an email. For water coming through a ceiling, shut off the water and call a local contractor directly. For a sagging ceiling or a cracked beam, keep people out of the room.
If you smell gas, leave the building first, then call 911 or the gas utility from outside. We are slower than the people you need.
How can I reach HyreRemodel?
Questions, corrections, press, partner and privacy requests. Say in the first line which one it is.
One number serves every Hyre guide site, so say that you are calling about HyreRemodel. Nobody on it can price a project or send a contractor.
6975 Union Park Avenue, Midvale, UT 84047, United States
For letters only. There is no office to visit.
The plan your remodel form asks for the zip code, the project and the timing in one pass, so we can reply without a round of questions.
We publish no guaranteed reply time, because we would rather not promise one we might miss. A person reads every message, in the order it arrives.
What can HyreRemodel help with?
- Which project fits. A new kitchen, an addition or a finished basement can each solve the same problem. The remodeling services lay them out.
- Reading a bid. Allowances, exclusions, the payment schedule and the change-order rule. See what remodeling costs.
- Permits and licenses. Which office answers which question, and how to look up a contractor’s license. Permits and approvals covers it.
- Sources and corrections. How a calculator works and where it stops, the source behind a figure, or a fix to a page.
What can HyreRemodel not help with?
- Pricing your project. We have not seen the house, and a number from us would be made up.
- Judging a bid’s price. The worksheet shows whether a bid is complete, which is the question we can answer.
- Recommending a company. We publish no rankings and no reviews. How contractors will be checked explains why.
- Reviewing a contract. We are not lawyers. A lawyer licensed in your state can advise on yours.
- Designing the work. We produce no drawings. Design-build or architect covers who does.
- What your local code requires. Codes are adopted and amended locally. Your building department decides.
Are you a remodeling contractor?
If you run a remodeling company and want to know how introductions will work, email us and say so. Matching is still being built, so we are having conversations, not signing anyone up.
What will not change: we publish no rankings and sell no placements, so there is nothing to buy. Anything commercial will be disclosed where it applies, as the editorial policy sets out.
What should I have ready before I write?
The zip code, roughly when the house was built, and what you want to change. If you have a bid, send it as it is, not a summary. The remodeling FAQ answers common questions, and how HyreRemodel works explains what happens to an inquiry.
HyreRemodel is an independent remodeling information site published at hyreremodel.com. It is not a remodeling contractor, a law firm, a design practice or a permit service.