HyreRemodel

Plan your remodel

Tell us about the project you are planning

Tell us what you want to change and where you are. We will use it to help connect you with remodeling contractors serving your area.

You tell us the zip code, the type of project and what you are trying to solve. A person reads it, answers your question, and where we can, introduces you to remodeling contractors serving your area. It is free, there is no obligation to hire anyone, and no contractor receives your details until you agree to it.

  • Free, and no obligation to hire anyone
  • No contractor gets your details until you agree
  • We are not a remodeling contractor and will not price the work

What actually happens next. Contractor matching is still being built, so this is not an instant-quote marketplace and we will not pretend otherwise. Tell us the project and the zip code. A person reads it, answers your question, and tells you when we can introduce remodeling contractors in your area.

Would rather talk it through? Call (866) 582-8523. We can help you read a proposal; we cannot price your project.

Tell us about your project

Where is the property?

Zoning, permit fees, code requirements, licensing and labour rates are all local, and so is who can legally do the work.

What are you planning?

Pick the closest. "Not sure yet" is a real answer and a common one.

When are you hoping to start?

This decides whether we point you at contractors or at the planning guides first. Neither answer is the wrong one.

What type of property?
Tell us about the project

Optional, and the most useful box on this form. What you are trying to solve, roughly how old the house is, whether anything is moving — a sink, a wall, the panel, and whether you already have drawings.

How should we reach you?

Submitting tells HyreRemodel it may contact you about this enquiry. Your details are never sold, and no remodeling contractor receives them until you have agreed. See our privacy policy.

Common questions before you submit

Does it cost anything to use this?

No. Submitting the form is free and it does not commit you to a contractor, a design or a start date. You decide whether to speak to anyone and whether to hire.

Who will contact me?

HyreRemodel first. Our contractor matching is still being built, so we would rather tell you that than imply a network we do not yet have. Where we can introduce companies serving your area we will say so before anything is passed on, and no remodeling contractor receives your details until you have agreed to it.

Will my details be sold?

No. Introducing you to a professional you asked to be introduced to is not the same as selling a list, and we do not do the second thing. The privacy policy sets out what we store and how to have it deleted.

Do I have to give a phone number?

No. The phone field is optional and will stay optional. Consent to be called cannot lawfully be a condition of using a service, so the form sends without it.

Can you tell me what my remodel will cost?

Not from a form, and we will not pretend otherwise. What decides your number is what moves rather than what you choose — plumbing, structure and electrical, not tile, and that is specific to your house. What we can do is help you work out which project you are actually looking at, what a complete proposal should contain, and which questions separate a good company from a cheap one. The cost guide and the calculators are the useful starting points, and neither is gated.

I do not know what I want yet. Is it too early?

No, and "not sure yet" is an option on the form for that reason. Knowing the problem you are solving is more useful than knowing the project name, and a remodel scoped around the wrong problem is the most expensive mistake available. Tell us what is not working and we will point you at the part of the site that helps.

Is HyreRemodel a remodeling contractor?

No. HyreRemodel is an independent information resource and a platform intended to connect homeowners with remodeling contractors. We do not design, build, project-manage or supervise construction, we employ no tradespeople, and we do not rate, vet, recommend or guarantee any company’s work.

Not ready yet? Nothing here is gated.

You never have to fill this in to use the site. If you would rather understand the decision first: