Reference
Remodeling Glossary
The building, contract and code words you meet when you plan a remodel, read a proposal or walk a job site, defined plainly. 71 terms have a full page with diagrams, comparisons and dated sources; the rest are defined right here.
Start with these
Most searched
- Drywall
- Quartz Countertop
- Laminate Flooring
- Ductless Mini-Split System
- Solid Hardwood Flooring
- Bathroom Exhaust Ventilation
- Luxury Vinyl Plank (LVP)
- Floor Joist
- Home Remodeling
- Tile Backer Board
Ranked by US search volume in SEMrush exports, 2026.
Recently reviewed
- Accessibility Remodeling Oct 13, 2026
- Air Sealing Oct 13, 2026
- Bathroom Exhaust Ventilation Oct 13, 2026
- Bathroom Wet Area Oct 13, 2026
- Batt Insulation Oct 13, 2026
- Blower Door Test Oct 13, 2026
Browse by category
Remodeling Fundamentals and Planning 9
Structural Components and Framing 9
Drywall, Insulation and Interior Finishes 10
Kitchens and Cabinetry 9
Bathrooms and Wet Areas 9
Flooring and Tile Installation 10
Windows, Doors and Exterior Openings 9
Electrical, Lighting and Home Systems 10
Permits, Inspections and Codes 9
Costs, Quality and Construction Performance 9
All terms, A to Z
A
-
Accessibility Remodeling
Accessibility remodeling is renovation that removes physical barriers in a home, such as steps, narrow doors, high reach and slippery wet areas, so that people who use wheelchairs or walkers, or who have limited strength, balance or sight, can live there safely.
Permits, Inspections and Codes · full page -
Air Sealing
Air sealing is the work of closing the cracks, holes and gaps in a home’s outer shell so that heated or cooled air cannot leak out and outdoor or attic air cannot leak in, using caulk, foam, gaskets, weatherstripping and rigid blocking.
Costs, Quality and Construction Performance · full page
B
-
Bathroom Exhaust Ventilation
Bathroom exhaust ventilation is a fan and duct system that pulls moist air, odors and fumes out of a bathroom and discharges them directly outdoors, so steam from showers and baths does not condense on walls, ceilings and hidden framing.
Bathrooms and Wet Areas · full page -
Bathroom Waterproofing: see Shower Waterproofing Membrane
-
Bathroom Wet Area
A bathroom wet area is the part of a bathroom that takes direct water during normal use, such as a shower compartment, the walls above a tub with a shower head and the floor of a curbless or wet-room shower, and that therefore must be built with water-resistant surfaces and backing.
Bathrooms and Wet Areas · full page -
Batt Insulation
Batt insulation is a type of blanket insulation sold as flat, pre-cut pieces of fiberglass, mineral wool or natural fiber, sized to fit snugly between wall studs, floor joists or ceiling joists to slow the flow of heat through those framing cavities.
Drywall, Insulation and Interior Finishes · full page -
Blower Door Test
A blower door test is a diagnostic test that uses a calibrated fan, sealed into an exterior doorway, to push or pull air out of a house and measure how much air leaks through the building shell.
Costs, Quality and Construction Performance · full page -
Blown-In Insulation
Blown-in insulation is loose, fluffy insulation, usually cellulose or fiberglass, that a machine blows through a hose into attics, wall cavities and other hard-to-reach spaces, where it settles into a blanket that slows heat flow.
Drywall, Insulation and Interior Finishes · full page -
Building Envelope
A building envelope is the set of assemblies, such as walls, roof, floors, windows and doors, that separates the heated or cooled inside of a home from the outdoors and from unconditioned spaces like a vented attic or garage.
Costs, Quality and Construction Performance · full page -
Building Permit
A building permit is an official document from the local building department that authorizes specific construction work, such as building, altering, repairing or demolishing a structure, and requires that work to be inspected against the adopted building code.
Permits, Inspections and Codes · full page awaiting expert review
C
-
Cabinet Box Material
Cabinet box material is the panel product used to build the body of a cabinet, meaning its sides, bottom, top, back and shelves, most often plywood, particleboard or medium-density fiberboard (MDF), usually covered with a veneer, laminate or paint.
Kitchens and Cabinetry · full page -
Cabinet Face Frame
A cabinet face frame is a rectangle of solid wood rails and stiles fastened to the front edges of a cabinet box, which stiffens the box, hides its raw edges and gives the doors, drawers and hinges something to mount to.
Kitchens and Cabinetry · full page -
Cabinet Overlay
Cabinet overlay is the distance a cabinet door or drawer front extends past the edge of the opening it closes, which decides how much of the face frame or box edge stays visible around it.
Kitchens and Cabinetry · full page -
Cabinet Refacing
Cabinet refacing is a remodeling method that keeps the existing cabinet boxes in place and gives them a new face: new doors and drawer fronts, a new veneer or laminate skin over the face frames and exposed sides, and usually new hinges and hardware.
Kitchens and Cabinetry · full page -
Ceiling Joist
A ceiling joist is a horizontal framing member, usually a 2x lumber board or part of a truss, that spans between walls to carry the ceiling below and, in many roofs, to tie the bottom ends of the rafters together.
Structural Components and Framing · full page -
Certificate of Occupancy
A certificate of occupancy (CO) is a document issued by the local building official, after inspection, stating that a building or a described part of it complies with the adopted code and may legally be used for its stated purpose.
Permits, Inspections and Codes · full page awaiting expert review -
Color Rendering Index (CRI)
Color rendering index (CRI) is a 0-to-100 score of how closely a light source shows the colors of objects compared with a reference light of the same color temperature, where a higher number means colors look more natural.
Electrical, Lighting and Home Systems · full page -
Construction Contingency Budget
A construction contingency is money set aside in a remodeling budget, outside the contract price, to pay for conditions nobody could see before the walls were opened, such as rot, outdated wiring or hidden water damage.
Remodeling Fundamentals and Planning · covered in depth here -
Construction Defect
A construction defect is a flaw in the design, materials or workmanship of a building or improvement that makes it fail to meet the contract, the applicable code or accepted trade standards, and that causes or threatens damage or loss.
Costs, Quality and Construction Performance · full page awaiting expert review -
Construction Moisture Meter
A construction moisture meter is a hand-held tool that estimates how much water is in wood or another building material by measuring an electrical property, such as resistance between two pins or the response to a field from a flat sensor plate.
Costs, Quality and Construction Performance · full page -
Continuous Exterior Insulation
Continuous exterior insulation is a layer of rigid insulation board installed over the outside face of the wall framing, unbroken across studs, plates and headers, so heat cannot bypass the insulation through the wood or steel.
Drywall, Insulation and Interior Finishes · full page -
Countertop Edge Profile
A countertop edge profile is the shape a fabricator cuts and polishes into the exposed front and side edges of a countertop, from a nearly square eased edge to rounded, beveled, stepped or built-up shapes.
Kitchens and Cabinetry · full page -
Curbless Shower
A curbless shower is a shower with no raised curb at its entry, so the bathroom floor continues into the shower at the same level and a sloped floor, usually toward a linear drain, keeps water inside the wet area.
Bathrooms and Wet Areas · full page
D
-
Dedicated Electrical Circuit
A dedicated electrical circuit is a branch circuit, with its own breaker in the panel, that feeds only one appliance or one code-defined group of outlets, so that load never shares capacity with lights or other receptacles.
Electrical, Lighting and Home Systems · full page awaiting expert review -
Design-Build Remodeling
Design-build remodeling is a delivery model in which one company holds a single contract to both design the project and build it, instead of the owner hiring a designer or architect separately and then putting the drawings out to bid.
Remodeling Fundamentals and Planning · covered in depth here -
Drywall
Drywall is a building panel made of a noncombustible gypsum core with paper bonded to both faces, fastened to studs or joists to form the interior surface of walls and ceilings, then taped, coated with joint compound and painted.
Drywall, Insulation and Interior Finishes · full page -
Drywall Corner Bead
Drywall corner bead is a long, angled trim strip fastened over the outside corners of drywall to protect the edge from dents and give the joint compound a straight, crisp line to finish against.
Drywall, Insulation and Interior Finishes · full page -
Drywall Level of Finish
Drywall level of finish is a six-step scale, Level 0 to Level 5, published by the Gypsum Association in GA-214 that describes how much taping, joint compound and skim coating a gypsum board surface gets before paint or other decoration.
Drywall, Insulation and Interior Finishes · full page -
Ductless Mini-Split System
A ductless mini-split system is a heat pump or air conditioner that links an outdoor compressor unit to one or more indoor air handlers mounted in the rooms, joined only by refrigerant lines, a power cable and a condensate drain, so it moves heat without any ductwork.
Electrical, Lighting and Home Systems · full page
E
-
Egress Window
An egress window is a window large enough, low enough and easy enough to open that a person can climb out of a bedroom or basement in a fire and a firefighter can climb in, built to the emergency escape and rescue opening rules of the residential building code.
Permits, Inspections and Codes · full page awaiting expert review -
Electrical Panel Capacity
Electrical panel capacity is the largest current, in amperes, that a home’s electrical service and main panel are rated to deliver at once, set by the main breaker and service conductors and checked against a load calculation of everything the house might run.
Electrical, Lighting and Home Systems · full page awaiting expert review -
Engineered Hardwood Flooring
Engineered hardwood flooring is a real wood floor board made of several layers of wood veneer or slats glued together with the grain running in opposing directions, topped by a hardwood wear layer that forms the visible, walkable surface.
Flooring and Tile Installation · full page -
Engineered Wood Beam
An engineered wood beam is a horizontal structural member made in a factory by gluing wood veneers, strands or boards together under heat and pressure, so it is stronger, straighter and more uniform than a sawn lumber beam of the same size.
Structural Components and Framing · full page awaiting expert review -
Existing Building Code
An existing building code is a model code, most often the International Existing Building Code (IEBC), that sets the rules for repairing, altering, adding to, changing the use of and moving buildings that already exist, so that work on them does not have to meet every new-construction rule.
Permits, Inspections and Codes · full page awaiting expert review -
Expansion Gap in Flooring
An expansion gap in flooring is the space left between the edge of a floor and the walls, cabinets, pipes and other fixed objects around it, so the floor can swell and shrink with humidity and temperature without buckling.
Flooring and Tile Installation · full page -
Exterior Door Threshold
An exterior door threshold is the strip fixed across the bottom of an outside door opening, between the jambs, that the door closes against to block air and water while giving a durable surface to step over.
Windows, Doors and Exterior Openings · full page
F
-
Final Building Inspection: see Rough-In Inspection
-
Floating Floor Installation
Floating floor installation is a method of laying flooring in which the planks or tiles lock or glue to each other but are not fastened to the subfloor, so the whole floor rests on the surface below as one connected sheet.
Flooring and Tile Installation · full page -
Floor Joist
A floor joist is one of a series of parallel horizontal framing members, usually lumber or engineered wood I-joists, that span between walls, beams or foundations to carry the subfloor and everything on it down to the supports at each end.
Structural Components and Framing · full page -
Floor Underlayment
Floor underlayment is a thin layer installed between the subfloor and the finished floor, such as foam, cork, rubber, felt, plastic sheeting or thin plywood panels, that cushions the floor, smooths small flaws, blocks moisture from below or reduces noise, depending on the type.
Flooring and Tile Installation · full page -
Frameless Cabinet Construction: see Cabinet Face Frame
G
-
Grout Joint
A grout joint is the space left between tiles, filled with grout, that locks the tiles together, seals their edges and absorbs the small differences in tile size and flatness that every tile has.
Bathrooms and Wet Areas · full page
H
-
Handrail Code Requirements
Handrail code requirements are the building-code rules for the rail a person grips on a stair or ramp, covering when one is required, its height above the stair nosings, its grip shape and size, its clearance from the wall, and how it runs and ends.
Permits, Inspections and Codes · full page awaiting expert review -
Home Energy Audit
A home energy audit is an inspection of a house, backed by diagnostic tests, that finds where and how the home uses and loses energy and ranks the improvements that would cut that waste.
Electrical, Lighting and Home Systems · full page -
Home Remodeling
Home remodeling is construction work that changes an existing house’s layout, structure, systems or use, such as moving walls, reworking a kitchen, adding a bathroom or finishing a basement, rather than simply repairing or refreshing what is already there.
Remodeling Fundamentals and Planning · full page -
Home Renovation vs. Remodeling: see Home Remodeling
-
HVAC Load Calculation
An HVAC load calculation is an engineering estimate of how much heat a home loses on a cold design day and gains on a hot one, measured in Btu per hour, so that heating and cooling equipment and ducts can be sized to match the house instead of guessed.
Electrical, Lighting and Home Systems · full page
J
-
Joint Compound
Joint compound is a paste, sold ready-mixed or as a powder, that drywall finishers spread over the seams, screw heads and corner bead of gypsum board to bed the joint tape and build a smooth surface that can be sanded and painted.
Drywall, Insulation and Interior Finishes · full page
K
-
Kitchen Cabinet Filler Strip
A kitchen cabinet filler strip is a narrow board, finished to match the cabinets, that fills the space between a cabinet and a wall, corner, appliance or another cabinet so doors, drawers and handles can open without hitting anything.
Kitchens and Cabinetry · full page -
Kitchen Work Triangle
The kitchen work triangle is a layout guideline that connects the three main work centers of a kitchen, the sink, the cooktop or range, and the refrigerator, with imaginary lines, and sets limits on how long each line and the total loop should be.
Kitchens and Cabinetry · full page
L
-
Labor vs. Material Costs: see Remodeling Cost Per Square Foot
-
Laminate Flooring
Laminate flooring is a manufactured floor covering made of a wood-fiber core board, usually high-density fiberboard, topped with a printed decorative layer and a clear protective wear layer and balanced by a backing layer, sold as planks or tiles that click together.
Flooring and Tile Installation · full page -
Lighting Color Temperature
Lighting color temperature is a rating, in kelvin (K), that describes how warm or cool the white light from a bulb or fixture looks, from yellowish light at low numbers such as 2700K to bluish light at high numbers such as 6500K.
Electrical, Lighting and Home Systems · full page -
Load-Bearing Wall
A load-bearing wall is a wall that holds up part of the building above it, such as floor joists, ceiling joists or roof framing, and carries that weight down through the floors to the foundation.
Structural Components and Framing · full page awaiting expert review -
Low-E Window Glass
Low-E window glass is glass with a microscopically thin, nearly invisible metal or metal-oxide coating that reflects long-wave infrared heat, so it lowers a window’s U-factor and, in some versions, its solar heat gain, while still letting most visible light through.
Windows, Doors and Exterior Openings · full page -
Luxury Vinyl Plank (LVP)
Luxury vinyl plank (LVP) is a resilient floor covering made in plank form from layers of vinyl, with a printed design layer that imitates wood and a clear wear layer on top, installed glued down, loose-laid or as a click-together floating floor.
Flooring and Tile Installation · full page
N
-
Natural Stone Countertop
A natural stone countertop is a work surface cut and finished from a slab of quarried rock, such as granite, marble, quartzite, soapstone or limestone, rather than from a manufactured material like engineered quartz or laminate.
Kitchens and Cabinetry · full page -
Non-Load-Bearing Wall: see Load-Bearing Wall
P
-
Permit Plan Review
Plan review is the building department's check of a permit application's drawings and documents against the adopted codes before a permit is issued. Reviewers may approve the plans, approve them with conditions or return comments that must be answered first.
Permits, Inspections and Codes · covered in depth here -
Prehung Door Unit
A prehung door unit is a door slab that comes already mounted on hinges inside its own frame, with jambs on both sides and the head across the top, ready to set into a rough opening as one piece.
Windows, Doors and Exterior Openings · full page -
Punch List in Construction
A punch list in construction is a written list, made near the end of a project, of work that is unfinished, damaged or not built to the contract, which the contractor must complete or correct before the owner makes final payment.
Remodeling Fundamentals and Planning · full page
Q
-
Quartz Countertop
A quartz countertop is a kitchen or bath work surface cut from engineered stone, a manufactured slab made mostly of crushed quartz bound together with polymer resins and pigments, then fabricated to size and installed on base cabinets.
Kitchens and Cabinetry · full page
R
-
Recessed Lighting Housing
A recessed lighting housing is the metal can or mounting frame installed above a ceiling or inside a wall that holds a recessed light’s socket or LED module, its wiring connections and its trim, and whose ratings decide whether insulation may touch it and how much air it leaks.
Electrical, Lighting and Home Systems · full page awaiting expert review -
Remodeling Allowance
A remodeling allowance is a set amount of money written into a contract price for an item that has not been chosen yet, such as tile, light fixtures or appliances, which is adjusted up or down once the real item is picked.
Remodeling Fundamentals and Planning · full page -
Remodeling Change Order
A change order is a written, signed amendment to a remodeling contract that changes the work, the price or the schedule after the contract was signed. It should state what changes, the cost or credit, the time impact and both signatures before the changed work starts.
Remodeling Fundamentals and Planning · covered in depth here -
Remodeling Contractor Warranty
A remodeling contractor warranty is the contractor’s promise to repair defects in their workmanship, and sometimes in materials they supplied, that appear within a stated period after the job is finished, on the terms written in the contract or warranty document.
Costs, Quality and Construction Performance · full page -
Remodeling Cost Per Square Foot
Remodeling cost per square foot is a project’s total cost divided by the floor area it covers, used to compare jobs of different sizes or to make a first rough budget.
Costs, Quality and Construction Performance · full page -
Remodeling Draw Schedule
A draw schedule is the payment plan in a remodeling contract that ties each payment to a finished, checkable stage of work, such as passed rough-in inspection or closed walls, so the owner never pays far ahead of the work done.
Remodeling Fundamentals and Planning · covered in depth here -
Remodeling Project Schedule
A remodeling project schedule is the ordered list of phases and dates for a remodel, from design and permitting through material lead times, rough-in, inspections, finishes and the punch list, usually kept by the contractor and updated as work proceeds.
Remodeling Fundamentals and Planning · covered in depth here -
Remodeling Scope of Work
A remodeling scope of work is the written description, inside or attached to a contract, of exactly what work a contractor will do, which materials and equipment will be used, and what is excluded from the job.
Remodeling Fundamentals and Planning · full page -
Return on Remodeling Investment
Return on remodeling investment is the share of a remodel's cost that is recovered in the home's resale value, usually expressed as a percentage. Published averages are national or regional estimates, not an appraisal of any one house.
Costs, Quality and Construction Performance · covered in depth here -
Roof Truss
A roof truss is a prefabricated, engineered frame of lumber pieces joined into triangles, usually with metal connector plates, that spans from one bearing wall to another and carries the roof and often the ceiling below.
Structural Components and Framing · full page -
Rough-In Inspection
A rough-in inspection is a required building-department check of the plumbing, electrical, gas and mechanical systems a contractor has installed inside open walls, floors or ceilings, made before any of that work is covered, concealed or connected to fixtures.
Permits, Inspections and Codes · full page awaiting expert review
S
-
Self-Leveling Underlayment
Self-leveling underlayment (SLU) is a pourable mix, usually based on cement or gypsum, that is spread over a primed concrete or approved wood subfloor and flows out under its own weight to form a flat, smooth surface ready for tile, vinyl, laminate or wood flooring.
Flooring and Tile Installation · full page -
Shear Wall
A shear wall is a wall built and fastened to resist sideways forces from wind or earthquakes, so the house does not rack, lean or slide off its foundation.
Structural Components and Framing · full page awaiting expert review -
Shower Curb
A shower curb is the low raised barrier at the entry of a shower that holds water inside the shower floor until it reaches the drain.
Bathrooms and Wet Areas · full page -
Shower Pan
A shower pan is the floor of a shower, built or bought as a unit, that slopes toward the drain and holds a waterproof layer, so every drop that lands on it, or soaks through tile and grout, leaves through the drain instead of reaching the subfloor.
Bathrooms and Wet Areas · full page -
Shower Waterproofing Membrane
A shower waterproofing membrane is a watertight layer, applied as a sheet or a liquid, that sits under the tile and grout of a shower so water that soaks through the tile cannot reach the wall framing or subfloor.
Bathrooms and Wet Areas · full page -
Siding Rainscreen
A siding rainscreen is a wall design that leaves a narrow drainage gap between the back of the siding and the water-resistive barrier, so rain that gets behind the siding can drain out and the wall can dry instead of staying wet.
Windows, Doors and Exterior Openings · full page -
Sill Plate
A sill plate, also called a mudsill, is the lowest piece of wood framing in a house: a board laid flat on top of the concrete or masonry foundation and bolted to it.
Structural Components and Framing · full page -
Smart Thermostat Compatibility
Smart thermostat compatibility means whether a Wi-Fi thermostat can be powered by, and correctly control, a home’s heating and cooling system, which mostly depends on the system’s control voltage, the number and type of thermostat wires, and the equipment type.
Electrical, Lighting and Home Systems · full page -
Solar Heat Gain Coefficient (SHGC)
Solar heat gain coefficient (SHGC) is a window rating, from 0 to 1, for the share of the sun’s heat striking a window that ends up inside the house, whether it passes straight through the glass or is absorbed and then released indoors.
Windows, Doors and Exterior Openings · full page -
Solid Hardwood Flooring
Solid hardwood flooring is flooring milled from a single piece of wood from top to bottom, usually 3/4 inch thick with tongue-and-groove edges, nailed or stapled to a wood subfloor and finished either at the factory or on site.
Flooring and Tile Installation · full page -
Sound Transmission Class (STC)
Sound transmission class (STC) is a single-number rating of how well a wall, floor-ceiling, door or window blocks airborne sound such as voices, TV and music, measured in a laboratory under ASTM E90 and calculated under ASTM E413.
Drywall, Insulation and Interior Finishes · full page -
Stair Rise and Run
Stair rise and run are the two dimensions of each step: the rise, or riser height, is the vertical distance from one tread nosing to the next, and the run, or tread depth, is the horizontal distance between those nosings, measured at a right angle to the tread edge.
Permits, Inspections and Codes · full page awaiting expert review -
Structural Header
A structural header is a horizontal beam built into a load-bearing wall over a door, window or other opening, which picks up the weight from above and carries it sideways to studs or posts on each side of the opening.
Structural Components and Framing · full page awaiting expert review -
Subfloor
A subfloor is the structural layer of plywood, OSB or boards fastened across the floor joists that carries people and furniture to the framing and gives the finished floor a flat, solid base.
Flooring and Tile Installation · full page -
Substantial Completion
Substantial completion is the stage of a construction project when the work is complete enough, under the contract documents, that the owner can occupy or use it for its intended purpose, even though minor punch list items may still need to be finished or corrected.
Costs, Quality and Construction Performance · full page
T
-
Thermal Bridging
Thermal bridging is heat flowing around your insulation through solid parts of a wall, roof or floor, such as wood studs, steel framing, headers and slab edges, that run from the warm inside surface to the cold outside surface.
Drywall, Insulation and Interior Finishes · full page -
Thinset Mortar
Thinset mortar is a cement-based tile adhesive, made from portland cement, fine sand and additives, that is mixed with water or a liquid polymer and spread in a thin, notched layer to bond ceramic, porcelain or stone tile to a floor, wall or backer board.
Bathrooms and Wet Areas · full page -
Tile Backer Board
Tile backer board is a rigid panel, most often made of portland cement reinforced with glass-fiber mesh, that is fastened to studs or a subfloor to give ceramic and stone tile a stable surface that will not swell, soften or rot when it gets wet.
Bathrooms and Wet Areas · full page -
Tile Lippage
Tile lippage is the difference in height between the edges of two tiles that sit next to each other, so that one tile edge stands proud of its neighbor across the grout joint.
Flooring and Tile Installation · full page
V
-
Vapor Retarder
A vapor retarder is a material or coating built into a wall, ceiling or floor to slow the movement of water vapor through it by diffusion, so moisture from indoor air does not condense inside the assembly.
Drywall, Insulation and Interior Finishes · full page
W
-
Wall Stud
A wall stud is one of the vertical boards, usually 2x4 or 2x6 lumber, that run from the bottom plate to the top plate of a framed wall and carry its load, hold its sheathing and drywall, and make room for wires, pipes and insulation.
Structural Components and Framing · full page -
Weather-Resistant Barrier (WRB)
A weather-resistant barrier (WRB) is a continuous sheet or coating installed over the studs or sheathing of an exterior wall, behind the siding, that catches water getting past the cladding and drains it back outside before it can soak the wall.
Windows, Doors and Exterior Openings · full page -
Whole-House Ventilation
Whole-house ventilation is a fan-driven system that swaps stale indoor air for outdoor air on a steady schedule across the whole home, instead of relying on leaks and open windows.
Electrical, Lighting and Home Systems · full page -
Window Flashing
Window flashing is the set of thin, waterproof materials, such as self-adhered tape, flexible membrane or bent metal, installed around a window opening so that any rain that gets behind the siding is directed back outside instead of into the wall framing.
Windows, Doors and Exterior Openings · full page -
Window Rough Opening
A window rough opening is the framed hole in a wall, bounded by the header, jack studs and rough sill, that a window unit is set into, sized a little larger than the window so it can be shimmed plumb, level and square.
Windows, Doors and Exterior Openings · full page -
Window U-Factor
Window U-factor is a rating of how fast heat passes through a whole window, frame and glass together, for each square foot and each degree of temperature difference between inside and outside.
Windows, Doors and Exterior Openings · full page -
Window Water Management: see Window Flashing
No term matches. Try a shorter word.
Related resources
- What remodeling costsWhat moves a remodel budget, and how allowances, contingency and change orders differ
- Permits and approvalsPlanning versus building departments, plan review, inspections and closing a permit
- Remodeling contractsFixed price or cost-plus, payment stages, change orders, liens and warranties
- Design-build or architectWho draws the project, who stamps it and who checks the builder
- Permit checkerWhich kinds of remodeling work tend to need a permit
- Flooring calculatorWork out how much flooring a room takes, with waste
Questions about this glossary
What does this remodeling glossary cover?
The HyreRemodel glossary covers the words a homeowner meets while planning a remodel, reading a contractor's proposal or walking a job site: planning and contract terms, framing and structure, drywall and insulation, kitchens and cabinets, bathrooms and waterproofing, flooring and tile, windows and doors, electrical and mechanical systems, permits and codes, and how a house performs once the work is done.
Each full page explains the term, shows how to recognize it on a job and links the related terms.
Where do the definitions and facts come from?
Every full glossary page lists its sources with the date each one was checked.
The pages lean on primary sources such as the International Code Council model codes, the U.S. Department of Energy, ENERGY STAR, the National Fenestration Rating Council, the U.S. Environmental Protection Agency, industry standards bodies and manufacturer installation instructions.
Where a rule depends on the code edition your city or county has adopted, the page says so instead of quoting one number as if it applied everywhere.
Does the glossary give remodeling prices?
No. HyreRemodel does not publish average job prices, because a national number says little about what one house in one market will cost. Cost terms explain what a figure includes and how to read a proposal, and link to the cost guide and calculators, where you enter your own numbers.
Why are some pages marked as awaiting review?
Pages about load-bearing walls, beams and headers, electrical capacity and circuits, egress, stairs and handrails, permits, inspections and construction-defect law are held from search engines until a licensed professional has checked them. They are written in full and readable here, but they say plainly that review is still pending.
Why do some terms send me to another page?
Some terms are two halves of one idea, such as a load-bearing wall and a non-load-bearing wall, or face-frame and frameless cabinets.
Rather than publish two near-identical pages, the glossary keeps one full page and explains the other term inside it.
Terms that another HyreRemodel guide already covers in depth, such as change orders or design-build, point to that guide.