HyreRemodel

Compare

Kerdi vs RedGard Waterproofing: Which One Fits Your Project

Both are listed tile waterproofing membranes. One arrives at a set thickness; the other is built up on site.

Updated August 16, 2026

Plan Your Remodel What it costs

Written by HyreRemodel Research Desk Primary-source research and fact checking

The short answer

Kerdi vs RedGard waterproofing is sheet versus liquid. Schluter KERDI is an 8-mil polyethylene sheet with fleece on both sides, set in thinset mortar, and ICC-ES report ESR-2467 lists it as meeting ANSI A118.10 and for use as a shower lining under IRC P2709.2.

RedGard is a liquid membrane rolled or brushed on; Custom Building Products lists it for crack prevention under ANSI A118.12 and as an IAPMO pan liner meeting ANSI A118.10.

Kerdi gives a fixed thickness with seams to overlap; RedGard gives a seamless coat whose thickness depends on the installer.

What decides between Kerdi and RedGard?

Thickness control

A sheet is the same thickness everywhere. A liquid is only as thick as it is applied.

Seams and corners

Kerdi needs overlapped seams and preformed corners. RedGard has no seams; corners and pipe penetrations are treated as its instructions require.

System fit

Kerdi pairs with Schluter drains and bands. RedGard goes over many substrates and drains; check each maker’s list.

How do Kerdi and RedGard compare?

From the ICC-ES report and the maker’s product page. Read the current technical data sheet for coats, cure and flood-test timing.

Compared onSchluter KERDI (sheet)RedGard (liquid)
Form8-mil polyethylene with fleece both sidesLiquid, applied on site in coats
Waterproofing standardANSI A118.10 (ICC-ES ESR-2467)ANSI A118.10 as an IAPMO-listed pan liner
Crack isolationNot claimed for KERDI in ESR-2467ANSI A118.12, per the maker
BondingSet in thinset mortarBonds as it cures; tile set over it
Thickness checkFixed by the sheetDepends on coats and coverage rate
SeamsOverlaps and bands at jointsNo seams; corners detailed per instructions

When Kerdi fits

You want a fixed, inspectable thickness

The sheet does not depend on how hard it was rolled.

The shower is a Schluter system

Drains, bands and preformed corners from one maker.

Steam showers

Schluter makes a thicker, vapor-retarding KERDI-DS; ESR-2467 lists it as 20 mil.

The walls are being built with foam board

Schluter sells a board and membrane system; check that every part is on one maker’s list.

When RedGard fits

Complex shapes

Niches, benches and curves are coated without cutting sheet pieces.

You also want crack isolation on a floor

RedGard is listed under ANSI A118.12.

The installer has a coverage plan

Coats and rate written down, per the maker’s data sheet.

An existing floor needs crack isolation as well

A single liquid product listed for both uses can cover the bathroom floor and the shower in one approach.

Ask for a flood test either way.

Whichever membrane is used, the shower floor should be flood tested before tile goes down, as your inspector or the maker requires. Ask to see it.

What a shower waterproofing membrane does

What to ask the tile installer

Which membrane, and is it one system with the drain?
For a liquid: how many coats, and at what coverage?

Ask them to follow the data sheet.

For a sheet: how are seams and corners lapped?
When is the flood test, and can I see it?
Which thinset is used over or under the membrane?

Makers specify compatible mortars. See thinset mortar.

What to have ready before the tile bid

The shower layout

Niches, benches and curbs add corners to detail.

The drain type

A linear or point drain, and which membrane it is listed with.

The substrate

Cement board, foam board or drywall, each per the membrane maker’s list.

A request to see the membrane

Ask for photos before tile goes on.

Where this goes wrong

A liquid coat applied too thin

Thickness is the waterproofing. Follow the coverage rate.

Mixing systems without checking

Drain and membrane makers list what they warrant together.

No flood test

A leak found after tile is set means tearing it out.

Your inquiry

Tell us about the remodel

Nothing goes to a remodeling contractor unless you agree.

Free, with no obligation: a person at HyreRemodel reads your request and replies by email. Matching with remodeling contractors is not live yet, so this is not a quote, and nothing goes to a contractor unless you agree.

Plan Your Remodel

One short form: your address and how to reach you. A person at HyreRemodel reads it and replies.

Your details

We reply to every inquiry. Nothing is passed on to anyone you have not asked us to contact.

Questions

Do I still need a shower pan liner with these membranes?
Both are listed for shower lining use when installed as each maker instructs, which is the role a traditional liner plays. Your inspector decides what is accepted, so confirm the method before work starts.
Is Kerdi or RedGard more waterproof?
Both are listed as meeting ANSI A118.10 for waterproofing under tile when installed per the maker. Performance depends on installation: seams for the sheet, thickness for the liquid.
What is ANSI A118.10?
The American National Standard for load-bearing, bonded waterproof membranes used under thin-set ceramic tile and dimension stone.
Can RedGard be used as a shower pan liner?
Custom Building Products lists RedGard with IAPMO as a shower pan liner meeting ANSI A118.10, with its own coverage rate for that use. Your local code official has the final say.
Can I mix Kerdi and RedGard?
Check both makers’ instructions. Each warrants its own system; mixing may not be covered.
Does HyreRemodel recommend one?
No. HyreRemodel has no tie to either maker and does no installation.

Written and audited by

HyreRemodel Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a remodeling contractor and not a sales floor.

We read the statute, the licensing register or the municipal fee schedule ourselves, and we publish the figure with the document it came from and the date we retrieved it.

Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify.

This program is new, and the counts below are small: they are what we have actually published, not what we intend to.

7
studies published
7
states in the contractor store we measure against
264
source documents linked from these pages, 101 of them on .gov domains
22,183
license records measured September 5, 2026

How this desk works

  • Primary sources only. Licensing facts come from the issuing board or the statute that creates the credential. Permit-fee facts come from the municipality that publishes the schedule. We do not cite an article that cites a source; we open the source and record the date.
  • Our own store is titled to the states it covers. We hold verified contractor records for seven states. An asset that rests on those records is titled to those states. National claims rest on federal or state-agency data (Census, BLS, EPA), never on our counts.
  • Absence of a record is not a finding about the company. A board that does not publish disciplinary history in a form we retrieved is excluded from any “clean record” claim. Unable to verify is not unlicensed. Not required is not not carried.
  • Fact, calculation, analysis and recommendation stay labelled. A statute is a source fact. A count we derived from our store is a HyreRemodel calculation. What that count means is analysis. What a homeowner should do next is a recommendation.
  • We do not remodel homes, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.

Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

ICC-ES ESR-2467, Schluter KERDI and related waterproofing membranes, ICC Evaluation Service. Retrieved October 22, 2026.
RedGard Waterproofing and Crack Prevention Membrane, product page, Custom Building Products. Retrieved October 22, 2026.

Information on this page is general and may vary by location, building code, zoning, the condition of your house and your own circumstances. It is not legal, design or engineering advice.

HyreRemodel is not a remodeling contractor: we do not design, build or manage remodeling work, and we do not supervise or warrant it. This page explains the work so you can judge a proposal and a contractor.