Living at Home During a Remodel: How to Plan
Living at home during a remodel works when the work zone is sealed from the rest of the house, you keep one working bathroom and a makeshift kitchen, and the contract sets site hours and daily cleanup.
In a home built before 1978, the EPA lead rule makes lead-safe work practices a legal requirement for covered jobs. Plan these before demolition starts.
Is it safe to stay home during a remodel?
Staying home is usually safe with containment, but lead and dust are the real risks.
Under the EPA lead RRP rule (40 CFR Part 745, Subpart E), anyone paid to disturb paint in a home built before 1978 must be a certified firm using lead-safe practices, apart from small jobs under 6 sq ft per room inside.
Ask for the firm’s certificate. Do not run the HVAC through a dusty or moldy work area; the EPA (retrieved October 22, 2026) warns against running a system you suspect is contaminated with mold.
What should you set up before work starts?
- A sealed work zone. Plastic sheeting, a zipper door and covered vents.
- A temporary kitchen. Fridge, microwave and a sink nearby, away from dust.
- One working bathroom, or a plan if the only one is being remodeled.
- A safe path for children and pets, away from tools and open floors.
- Valuables and medicines moved out of the work area.
Which documents should you gather?
- Contract terms on site hours, cleanup, containment and bathroom use by the crew.
- The lead-safe firm certificate, for a pre-1978 home.
- The schedule, showing when water, power or heat will be off.
- Your homeowners insurance, to confirm coverage during construction.
Who should you contact?
The contractor, to agree site rules in writing. Check the firm’s license in the license lookup directory and its lead certification with the EPA. Tell your insurer about the work. Ask the building department about inspections you may need to be home for (see permits and approvals).
What are the next steps?
Walk the house with the contractor and mark the work zone, the path in and out, and where materials will be stored. Agree how you will hear about utility shut-offs ahead of time.