Choosing how to run it
Should I Hire an Architect for a Remodel?
Should you hire an architect for a remodel? Hire one when you are adding space, changing the shape of the house, or your building department requires drawings stamped by a licensed design professional.
For a kitchen or bath that keeps its walls, a designer or design-build contractor is often enough. Ask the building department first, because it may decide for you.
When does a remodel need an architect?
A remodel needs an architect when the code or the building department requires stamped drawings for the scope, or when the design problem is hard: an addition, a second story, an open plan, or work on a historic house.
Which work requires a licensed design professional is set by state law and local practice, so we do not state a national rule.
When can you skip one?
You can often skip an architect for like-for-like work: new cabinets, tile, fixtures and finishes in the same footprint. A kitchen or bath designer, or a design-build firm, plans that kind of work. Structural changes may still need an engineer’s stamp even when no architect is involved.
Which documents should you gather?
- Your written scope of work and budget range.
- Existing plans or a survey of the house, if you have them.
- Your local zoning limits, for any addition (setbacks, height).
- The building department’s list of drawings required for your permit.
Who should you contact?
Call your building department and ask what drawings, and whose stamp, your scope needs (see permits and approvals). Check an architect’s license on your state architecture board, and a contractor’s on the state contractor board using the license lookup directory.
What are the next steps?
If you hire an architect, decide how much of the job they cover: drawings only, help during bidding, or construction oversight. Each costs more and protects you more. Design build vs architect explains the trade-offs. Whoever you hire, the FTC (retrieved October 22, 2026) advises a written contract with all blank spaces filled in.
Not sure what you need? Plan Your Remodel: describe the project, and a person at HyreRemodel reads it and replies.