Questions this calculator answers
- How much space do you need beside a toilet?
- The model code calls for at least 15 in from the toilet’s center to any side wall, partition or vanity.
- How much space do you need in front of a toilet?
- At least 21 in to any wall, fixture or door in the model code. Your local code may require more; check it.
- Does this check the shower and vanity?
- No. It checks the toilet clearances only. Shower size and other fixtures have their own code sections.
- Can I move my toilet?
- Usually, with a permit and a licensed plumber. The drain has to slope and vent correctly. Confirm with your building department.
Sources and methodology
Figures dated October 22, 2026. Last reviewed .
- ICC-ES PMG-1096 listing (water closets), installation section (ICC Evaluation Service, retrieved October 22, 2026). 15 in side, 21 in front, 30 in center to center, 30 × 60 in compartment.
- 2021 International Residential Code, Sections R307 and R303.3 (International Code Council, retrieved September 5, 2026). Fixture spacing and bathroom ventilation. Adoption is local.
Related
- Bathroom remodeling The full job.
- Small bathroom remodel Where every inch counts.
- Kitchen layout planner The same check for kitchens.
- Permit checker Whether the work needs a permit.