Questions this calculator answers
- How do I calculate countertop square footage?
- Multiply each run’s length by its depth in inches, add the island, and divide by 144. Count each corner once and leave the sink and cooktop cutouts in.
- How much do granite countertops cost?
- HomeGuide’s granite band is $50 to $200 per square foot (retrieved August 23, 2026). Its kitchen page puts an average kitchen’s counters at $1,500 to $6,000. Your fabricator’s rate for your slab is the figure to use.
- Do I subtract the sink cutout?
- No. The opening comes out of a slab you still buy, and fabricators price the piece. A cutout can add a charge of its own, so ask.
- When are countertops measured for fabrication?
- After the cabinets are installed. The fabricator templates from the real cabinets, because walls can be out of square. Order from a drawing and pieces can miss.
- Is the backsplash included?
- Only if the bid says so. Measure it as its own area: a 4 in backsplash along 20 ft is about 6.7 sq ft. A full-height one can need another slab.
- Why does the slab count matter?
- Stone is bought by the slab. A layout just over what one slab covers can add another. Ask the fabricator how many slabs your layout uses and what change would save one.
Sources and methodology
Figures dated August 23, 2026. Last reviewed .
- How Much Does It Cost to Remodel a House? (HomeGuide, retrieved August 23, 2026). Granite $50 to $200 per square foot. Member-reported quotes.
- How Much Does a Kitchen Remodel Cost? (HomeGuide, retrieved August 23, 2026). Counters $1,500 to $6,000 for an average kitchen.
Related
- Kitchen remodel cost calculator Counters as one line among cabinets, appliances and wet-work.
- Kitchen remodeling Where the countertop falls in the order of the job.
- Flooring calculator Another takeoff: area plus waste × your rate.
- Quote comparison worksheet Six written items to check on every bid.
- What remodeling costs What moves a remodeling price.