Questions this calculator answers
- How do I calculate the number of stairs?
- Divide the floor-to-floor rise by 7.75 in and round up. 108 in ÷ 7.75 = 13.9, so 14 risers at 7.71 in each.
- What is the maximum riser height?
- IRC R311.7.5.1 sets it at 7¾ in, with no more than ⅜ in difference between risers in a flight. Your local code may amend it.
- What is the minimum tread depth?
- IRC R311.7.5.2 sets it at 10 in, measured between the nosings of adjacent treads.
- Why is there one fewer tread than risers?
- The upper floor is the last step. 14 risers rise to it, and 13 treads sit between them.
Sources and methodology
Figures dated October 22, 2026. Last reviewed .
- City of Boise IRC Code Handout #437, Stair Treads & Risers (02/2022) (City of Boise, retrieved October 22, 2026). IRC R311.7.5 text: risers, treads, nosings.
- 2021 International Residential Code, Chapter 3 (International Code Council, retrieved September 5, 2026). Section R311.7, stairways. Adoption is local.
Related
- Basement finishing Where stairs get rebuilt.
- Attic conversion Where a new stair is needed.
- Permit checker Whether the work needs a permit.
- Insulation calculator For the attic you are opening.