HyreRemodel

Contractor records

Remodeling contractors with clean board records

Why we publish no list of “clean” contractors, what each of seven licensing authorities shows the public (checked September 5, 2026), and how to check a contractor’s discipline yourself.

Updated September 2026 · Data as of September 5, 2026

Written by HyreRemodel Research Desk Primary-source research and fact checking

32 records with retrieved discipline All Utah, of 22,183 license records
44 Arizona licenses suspended or revoked Every one still shows an empty discipline field
5 of 7 authorities publish discipline online UT, CA, AZ, NV, FL; checked September 5, 2026
0 named firms on this page We could not re-check firms against the live board

The finding

We cannot publish a list of remodelers with clean board records, and an empty discipline field is not a clean record.

Of our 22,183 license records, only Utah’s 703 have discipline retrieved: 32 with board actions, 671 with DOPL’s time-limited “no actions.”

Elsewhere the field is empty because we have not retrieved it; even 44 suspended or revoked Arizona licenses show nothing. Check the contractor on the board’s own lookup.

An empty field is not a clean record

Our license files have a discipline field. On 22,151 of 22,183 records it is empty. For 21,480 of those, empty just means we never filled it in.

Only in Utah does empty match something the board said: DOPL’s time-limited “no actions” string. Treating the two as the same is how a directory ends up misleading people.

Arizona settles it. The Registrar of Contractors’ search, queried in August 2026, marks 35 of our Arizona records suspended and 9 revoked. Those 44 licenses are not in good standing, yet their discipline fields are empty, because we took status from the search and not the complaint history the same registrar publishes.

A list that read “empty” as “clean” would put a revoked contractor on it. Our complaints field is also empty on all 22,183 records (0 filled in). That is missing retrieval, not proof that nobody complained. Absence of a record is not a finding about the company.

What a “clean board record” would have to mean

People search for “contractors with no complaints.” No board in this study publishes that, and we cannot compute it.

A complaint is an allegation, and boards can keep it confidential until they find probable cause, cite the contractor or take formal action. Under Fla. Stat. §455.225(10), a Florida complaint stays confidential until ten days after probable cause, or until the licensee waives confidentiality. Nevada discloses only complaints that ended in discipline.

California discloses some complaints under Business and Professions Code §7124.6: those referred for accusation, or for investigation after a supervisor found a probable violation serious enough for suspension, revocation or prosecution. It never discloses complaints resolved in the contractor’s favor.

North Carolina’s board says a complaint is a public record, but “the information that remains on the license record is the resulting Board decision,” and a disciplinary action “will be disclosed upon request.”

So the public record, where there is one, is discipline: citations, accusations, suspensions, revocations, stipulations, docket numbers. A clean board record can only mean a license whose board publishes discipline, which we retrieved, and which came back with no actions inside the board’s own disclosure window.

That gives three tests, and failing any one excludes a firm: the board publishes, we retrieved it, and the empty result is the board’s, not ours. For a named firm there is a fourth: a live re-check on the board. We could not clear the fourth on September 5, 2026.

Four things that get mistaken for each other

Directories fold these into one badge. Mixing them up turns an empty web page, or our empty field, into a character reference.

Complaint
An allegation. Boards can keep it confidential until probable cause, a citation or formal action. Florida’s rule is statutory (§455.225(10)). Nevada’s is too (NRS 624.327), restated in its consumer-complaint PDF. California discloses only what §7124.6 requires, never complaints resolved in the contractor’s favor.
Discipline
What is left on the public record when a complaint goes somewhere: a citation, accusation, suspension, revocation, stipulation, consent order or docket number. A “clean board record” can only be a statement about this, inside the window the board discloses.
License status
Active, inactive, suspended, revoked, probation. Status can be recorded without discipline. Arizona proves it: we hold status on every Arizona record, including the 44 suspended or revoked, and discipline on none.
An empty field in our records
A default. In Utah it matches DOPL’s time-limited “no actions” string. On the other 21,480 records it matches nothing a board said. Ranking on it would rank our missing data.

What each board shows the public, checked September 5, 2026

Publishing and retrieving are different jobs. Five of the seven authorities (Utah, California, Arizona, Nevada, Florida) publish discipline a homeowner can look up without a records request. North Carolina discloses on request. Texas has no state remodeling board. We have retrieved discipline from one of them.

Utah DOPL: retrieved

Licensee Lookup & Verification showed “Information Current as of 09/03/2026” (September 3, 2026). Each contractor record shows either “YES View Actions” with a docket or “NO DISCIPLINARY ACTIONS WITHIN THE TIME FRAME ESTABLISHED IN UTAH CODE 63G-4-106 AND 107.”

Details sit behind reCAPTCHA v3 with no shareable link, so a named-firm check could not be cited. DOPL also runs a Disciplinary Actions and Citations search (blocked by Cloudflare for us this session) and posts monthly discipline newsletters.

California CSLB: publishes, not retrieved

Check a License exists “to verify information, including complaint disclosure.” Under §7124.6 (amended Stats. 2022 ch. 293, AB 2916, effective January 1, 2023), citations show for five years after compliance, accusations ending in suspension or stayed revocation for seven, unstayed revocations indefinitely, and letters of admonishment for one or two years.

The free data portal lists licensees but not discipline. The Complaint Disclosure / Legal Action File is a separate paid order through CSLB Data Services, listed with the Action Codes file at a non-refundable $235. We have not bought it. All 4,820 California discipline fields are empty.

Arizona ROC: publishes, not retrieved

The posting list offered, as of September 2, 2026, a current-contractors file of 57,886 records and a Disciplinary Actions CSV for March 3 to September 2, 2026 (71.77 KB). The CSV itself warns that some discipline is temporary and that good standing must be confirmed on Contractor Search.

Each license record also shows complaints from the prior two years, with a complaint ID and outcome. roc.az.gov/contractor-search returned a Cloudflare challenge this session, and the registrar’s search app loaded no citable record. We loaded neither the CSV nor the complaint pane, and name no firm from either.

Nevada NSCB: publishes, not retrieved

The license search (linked from the homepage as “Verify Contractor License”) searches by license number, company, or principal or qualified individual. The board’s consumer-complaint PDF: “Complaint disclosure is restricted by law to cases which resulted in disciplinary action taken by the Board.”

That restates NRS 624.327: investigation files are confidential; the charging document and discipline record are public. Monthly hearing-outcome PDFs are posted (the May 2026 one is live). We have not parsed them and name no firm from them.

Florida DBPR: publishes, not retrieved

The licensee search (page timestamp 9/4/2026) has a “View License Complaint” link on each license. DBPR’s FAQ: “The only complaints that appear on this screen are complaints for which probable cause has been found or where the subject of the complaint has waived his/her right to confidentiality and complaints against unlicensed persons.”

We took roster and status from this search, not the complaint pane. Open investigations will not appear there.

North Carolina NCLBGC: on request only

nclbgc.org/license-search/ now redirects to the board portal, which searches by class, license number, qualifier, company, name, phone and address, with no discipline field. The contractor FAQ: “A disciplinary action will be disclosed upon request.”

Quarterly newsletter summaries list final decisions and consent orders. We did not request a file or parse the newsletters, and name no firm from them.

Texas is left out because TDLR does not license residential general contractors, so there is no remodeling discipline page to open. Five of six boards publish something a homeowner can look up today; we have retrieved one. The gap is on our side, not in their registers.

What we have actually retrieved

Our count from 22,183 license files, measured September 5, 2026: the discipline field is filled in on 32 records, all Utah. Each holds the board’s own “YES View Actions” flag with a docket citation, and the 32 match, one for one, the “YES” rows in the DOPL files we retrieved on August 29–30, 2026.

Utah’s other 671 records are empty but not missing: each matches a DOPL record showing the time-limited “no actions” string. Utah is the only state where empty means “the board said no, inside its window.”

California, Florida, Arizona, Nevada, Texas and North Carolina account for 21,480 records, all with empty discipline fields. That is missing retrieval.

We did retrieve other fields there. All 4,820 California records are active, and 919 carry board notices (workers’ comp events, license reissues, salesperson letters). Those are administrative, not discipline. In Arizona we hold status (active, inactive, suspended, revoked) but no discipline.

Utah DOPL32
703 licenses retrieved; 671 returned the time-limited “no actions” string
California CSLB0
4,820 licenses; the board publishes, we did not retrieve
Florida DBPR0
7,130 licenses; the board publishes, we did not retrieve
Arizona ROC0
4,932 licenses, including 44 suspended or revoked
Nevada NSCB0
3,494 licenses; the board publishes, we did not retrieve
Texas (city registrations)0
955 registrations; no state board to retrieve from
North Carolina NCLBGC0
149 licenses; disclosed on request, not requested

Records with discipline filled in, by authority, counted September 5, 2026 from data/remodeling-data/licenses/. Zero means not retrieved, except in Utah. The bar counts retrieved discipline, not clean contractors.

Utah, and why we still name no firms

Utah passes the first three tests: the board publishes, we retrieved the field, and empty is the board’s empty.

On August 29–30, 2026 we held 703 Utah licenses for 703 companies: 32 with “YES View Actions” and a docket, 671 with the time-limited “no actions” string. All were listed Active, expiring November 30, 2027. That is still not a clean-record list, for three reasons.

The “no” expires. Utah Code §63G-4-106 makes an agency remove disciplinary actions from its website within ten years of the final order. §63G-4-107 lets a person petition for removal after five years if they completed the order, have not repeated the violation and pay a fee, or sooner with a related criminal expungement.

So a firm with a 2014 revocation that aged off the website would sit among our 671 “no” records. Older actions remain public records under GRAMA; they are just off the website.

The lookup cannot be cited per firm. LLV has no shareable per-license link, and details sit behind reCAPTCHA v3.

On September 5, 2026 it reported information current as of September 3, 2026, but a named-firm check needs a live browser session we cannot cite.

Our rule: if we cannot confirm a named firm against the live board, we do not name it.

671 identical “no” results are not a ranking. No second public-record measure orders them in a way we could defend, and we use no review scores or self-reported revenue. An alphabetical list would be a directory of absences, and a sample without a live check would be a sample of our August files.

What Utah does show is the method. 32 of 703 Utah remodelers we researched, about one in twenty-two, had a published action inside DOPL’s window on the August dates.

That describes our sample, not a Utah industry rate. If you are hiring in Utah, run LLV yourself, read the docket, and ask DOPL under GRAMA if you need more than the website shows.

Why the other six states cannot support a clean-record claim

StateRecordsBoard publishes discipline?Retrieved here?Why excluded
California4,820Yes: Check a License, BPC §7124.6NoEmpty means not retrieved. Check CSLB.
Florida7,130Yes: DBPR licensee search, after probable causeNoEmpty means not retrieved; open complaints are confidential under §455.225(10).
Arizona4,932Yes: complaints on the search, plus the posting-list CSVNo44 licenses already suspended or revoked with empty fields.
Nevada3,494Yes: license search and hearing-outcome PDFsNoEmpty means not retrieved; complaints disclosed only after discipline.
Texas955No state GC boardNot applicable805 San Antonio and 150 El Paso city registrations, not TDLR. See Texas.
North Carolina149On request, plus newsletter summaries; no discipline field on the searchNoThe board discloses discipline “upon request.” We did not request it.

Our records measured September 5, 2026; board sites checked September 5, 2026. “Publishes” describes the board’s public site; “Retrieved here” describes our files.

Texas is a different kind of exclusion: the state licenses no residential general contractor, so its 955 city registrations carry no board discipline and are not comparable with a CSLB or DOPL license. See states without contractor licensing.

What a firm would need before we listed it

The board publishes discipline in a searchable form

A newsletter PDF, a GRAMA response or “disclosed upon request” is not enough. A homeowner has to be able to pull the same record we pulled.

We retrieved it, with a source link and a date

An empty default is not a retrieval. Today only Utah passes.

Empty means the board said no

In Utah, empty matches DOPL’s time-limited “no actions” string. Everywhere else in our records, empty matches nothing the board said.

The named firm is re-checked on the live board first

An August snapshot is not a statement about a company today. We could not complete that re-check on September 5, 2026, so we name no one.

Public-record facts only

License number, class, board status and retrieved discipline. No review scores, no self-reported revenue, no “years in business” we did not read off a register, no composite score.

A time-limited “no” is labeled as time-limited

Utah’s §§63G-4-106 and 107, California’s five- and seven-year windows, Florida’s probable-cause confidentiality: a clean window is not a clean history. If we cannot state the window, we do not say “clean.”

Texas city registrations never count as board records

El Paso and San Antonio registrations are not TDLR licenses and are not comparable with CSLB, ROC, NSCB, DBPR, DOPL or NCLBGC.

Suspended or revoked with an empty field is a veto

Arizona’s 44 records prove it. If a future retrieval still leaves those fields empty, the retrieval has failed, not the companies.

How to check a contractor’s discipline yourself

A discipline check is what we would run before naming a firm. You can run it for the one in front of you, before you sign rather than after the deposit clears.

1
Get the identifiers in writing

The legal business name (not the name on the truck), the state, the license number and the class. “Licensed and insured” on a card is not a number. If they will not give one, stop.

2
Open the issuing board, not a directory

Use the links above or the license lookup directory. Review sites, the BBB and our records are not the board. Save a dated screenshot.

3
Read status before discipline

A suspended or revoked license with a quiet complaint pane is still not in good standing. Our 44 Arizona records fail on status alone.

4
Read the discipline the board shows, and its window

California: complaints and legal actions, with the §7124.6 time limits. Utah: YES plus the docket, or the time-limited NO. Florida: View License Complaint, only after probable cause or waiver. Arizona: complaint ID and outcome, plus the CSV. Nevada: discipline only. North Carolina: ask the board.

5
Match the class to the job

A clean B-class license is not a plumbing license, and a clean CGC does not help if a different qualifier runs the job. See license classes by state.

6
Check the people behind the license

CSLB discloses citations on other licenses that share a qualifier. Florida links related licenses. Nevada searches by principal. Someone who lost one license and opened another is the same person.

7
If the board says “upon request,” ask

In North Carolina, email the board the license number and ask whether any disciplinary action exists. A newsletter summary does not replace that answer.

8
In Texas, check the city and the trades

There is no state general-contractor license. Confirm the city registration where the permit will be pulled (San Antonio or El Paso in our records, 955 records, not a state list), then the TDLR trade licenses the job needs. See Texas remodeling contractors.

9
Then go beyond the board

Check the building department that issues the permit, the secretary of state for an active business, an insurance certificate from the insurer dated for your project, and the bond if your state requires one. Then compare bids with the quote comparison worksheet.

Method and limits

Source files

22,183 license records in data/remodeling-data/licenses/ and 23,756 company files, measured September 5, 2026. Utah DOPL detail in data/remodeling-data/evidence/ut-dopl-remodeling-2026-08-29/ and …-2026-08-30/. The stale national-metrics.json (540 companies, August 16, 2026) was not used.

A sample of our own choosing

These are the companies we researched, in the seven states we chose, on the dates we checked. Counts reflect research effort, not each state’s industry, and nothing here is a discipline rate.

Utah’s “no” is a website window

§63G-4-106 removes actions from the website at ten years; §63G-4-107 allows a petition at five. GRAMA can still produce older files. We filed no GRAMA requests.

No live check of named firms

LLV was reachable on September 5, 2026 and current as of September 3, 2026, but a named-firm record needs a reCAPTCHA session and has no citable link. That is why we name no companies.

Five boards publish what we have not retrieved

CSLB, AZ ROC, NSCB, Florida DBPR and, on request, NCLBGC all make discipline available, as we confirmed on September 5, 2026. When we retrieve it and can re-check named firms, a Utah-style method becomes possible there. Not today.

No review scores, no revenue, no “best of”

Nothing here recommends hiring anyone. Even “no published action inside a window” is a description we will not attach to a name until the live board agrees.

Questions

Does an empty disciplinary field mean a contractor has a clean record?
No. In our records an empty field usually means we have not retrieved that board’s discipline. Only Utah’s matches a board answer, DOPL’s time-limited “no actions.” Just 32 of 22,183 records have actions filled in, and 44 suspended or revoked Arizona licenses still show empty fields.
Which states publish contractor disciplinary history online?
Of the seven authorities in our records, Utah DOPL, California CSLB, Arizona ROC, Nevada NSCB and Florida DBPR publish discipline on a public lookup. North Carolina’s board discloses it on request and in newsletter summaries. Texas has no state residential general-contractor license, so there is no state remodeling discipline to publish.
Why is California excluded from a clean-record list?
CSLB publishes complaint disclosure and legal actions on Check a License under BPC §7124.6, and sells a bulk discipline file. We hold 4,820 California licenses but have not retrieved that discipline, so every field is empty. Check the license on cslb.ca.gov instead.
Does Utah’s “no disciplinary actions” mean a contractor was never disciplined?
No. The string reads “no disciplinary actions within the time frame established in Utah Code 63G-4-106 and 107.” Actions come off the website at ten years, and a petition can remove them after five. Older actions can still be public records under GRAMA. A website “no” is a window, not a lifetime.
Does Texas license remodeling contractors?
Not at the state level. TDLR issues no residential general-contractor license. Our 955 Texas records are city registrations (805 San Antonio, 150 El Paso) and are not comparable with a CSLB or DOPL license. A Texas remodeler without a state license is not missing anything; the license does not exist.
How do I check a contractor’s disciplinary record myself?
Get the legal name, state, license number and class, then search that state’s board, not a directory: Utah LLV, CSLB Check a License, the Arizona ROC search and posting-list CSV, the NSCB license search, Florida DBPR (View License Complaint), or the NCLBGC portal plus an email to the board. Save a dated screenshot.
Which boards did you open, and when?
All six state boards, on September 5, 2026. Utah LLV, CSLB, Florida DBPR, Nevada NSCB and the NCLBGC portal loaded. Arizona’s posting list loaded with a Disciplinary Actions CSV for March 3 to September 2, 2026, but its contractor search returned a Cloudflare challenge. Opening a board is not retrieving its discipline; only Utah’s is in our records.
If the board website shows no complaints, is the contractor clean?
Not necessarily. Florida keeps complaints confidential until ten days after probable cause. Nevada shows only complaints that ended in discipline. California hides complaints resolved in the contractor’s favor, and citations age off after five years. Utah’s “no” is a window. North Carolina’s search shows no discipline at all. A blank pane is not a character reference.
Why don’t you publish a ranked list of contractors with no complaints?
Because we could not defend it. Boards publish discipline, not complaints, often inside time or confidentiality windows. We have retrieved discipline from one of seven authorities and could not re-check named Utah firms live. A ranked list under those conditions would rank our missing data.

Written and audited by

HyreRemodel Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a remodeling contractor and not a sales floor.

We read the statute, the licensing register or the municipal fee schedule ourselves, and we publish the figure with the document it came from and the date we retrieved it.

Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify.

This program is new, and the counts below are small: they are what we have actually published, not what we intend to.

7
studies published
7
states in the contractor store we measure against
264
source documents linked from these pages, 101 of them on .gov domains
22,183
license records measured September 5, 2026

How this desk works

  • Primary sources only. Licensing facts come from the issuing board or the statute that creates the credential. Permit-fee facts come from the municipality that publishes the schedule. We do not cite an article that cites a source; we open the source and record the date.
  • Our own store is titled to the states it covers. We hold verified contractor records for seven states. An asset that rests on those records is titled to those states. National claims rest on federal or state-agency data (Census, BLS, EPA), never on our counts.
  • Absence of a record is not a finding about the company. A board that does not publish disciplinary history in a form we retrieved is excluded from any “clean record” claim. Unable to verify is not unlicensed. Not required is not not carried.
  • Fact, calculation, analysis and recommendation stay labelled. A statute is a source fact. A count we derived from our store is a HyreRemodel calculation. What that count means is analysis. What a homeowner should do next is a recommendation.
  • We do not remodel homes, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.

Data as of September 5, 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

HyreRemodel contractor verification store, 23,756 companies and 22,183 license records across seven states, each with a source URL and retrieval date. Discipline filled in on 32 records (Utah only). Measured September 5, 2026 from data/remodeling-data/licenses/. national-metrics.json (540 companies, August 16, 2026) not used. Retrieved September 5, 2026.
Utah DOPL, Licensee Lookup & Verification, Public contractor lookup, current as of September 3, 2026 when opened September 5, 2026. Details are a reCAPTCHA-gated POST with no shareable per-license URL. 703 licenses in our records retrieved against it on August 29–30, 2026. Retrieved September 5, 2026.
Utah DOPL, Disciplinary Actions and Citations, Separate search for disciplinary actions and citations by entity name, license number or individual. Retrieved September 5, 2026.
Utah Code §63G-4-106, Access to information on state-controlled websites, Administrative disciplinary action must come off a state website no later than 10 years from the final order (or from commencement if no final order). Retrieved September 5, 2026.
Utah Code §63G-4-107, Petition to remove agency action from public access, A petition to remove a website record after five years if the order is completed, the violation not repeated and a fee paid; or with a related criminal expungement. Retrieved September 5, 2026.
California CSLB, Check a License, Public lookup “to verify information, including complaint disclosure”. Retrieved September 5, 2026.
California Business and Professions Code §7124.6, Complaint and legal-action disclosure: accusations and certain investigations; citations five years after compliance; suspensions and stayed revocations seven years; unstayed revocations indefinitely. Complaints resolved in the contractor’s favor are not disclosed. Retrieved September 5, 2026.
California CSLB, Public Data Portal, Free filtered lists (classification, county, master list, ZIP) and an instant license check. Not the paid Complaint Disclosure / Legal Action File. Not loaded into our records. Retrieved September 5, 2026.
California CSLB, Forms and Applications / Data Services, Paid bulk files: License Master, Business Principal, Workers’ Compensation / LLC Liability, Action Codes, and Complaint Disclosure / Legal Action File. Action Codes plus Complaint Disclosure / Legal Action is one $235 fee. Not purchased. Retrieved September 5, 2026.
Arizona Registrar of Contractors, Contractor Search, Public license search; complaint information appears on the license record. Returned a Cloudflare challenge this session. No named-firm record cited. Retrieved September 5, 2026.
Arizona Registrar of Contractors, Aura contractor search, The registrar’s Salesforce community search, used for roster and status in August 2026. Loaded as a JavaScript shell this session; no named-firm detail cited. Retrieved September 5, 2026.
Arizona Registrar of Contractors, Posting list (disciplinary actions), Index retrieved September 5, 2026: current-contractors file of 57,886 records, last updated September 2, 2026; Disciplinary Actions CSV for March 3 to September 2, 2026 (71.77 KB). The CSV warns some discipline is temporary; confirm good standing on Contractor Search. Not loaded; no firm named. Retrieved September 5, 2026.
Nevada State Contractors Board, Contractor license search, Public lookup by license number, company, or principal / qualified individual. Linked from the homepage as Verify Contractor License. Retrieved September 5, 2026.
Nevada State Contractors Board, Consumer complaint instructions (PDF), “Upon request, the Nevada State Contractors Board provides information about a licensed contractor’s license and bond status, as well as, disciplinary action. Complaint disclosure is restricted by law to cases which resulted in disciplinary action taken by the Board”. Retrieved September 5, 2026.
NRS 624.327, investigation records confidential; disciplinary records public, The existence of a complaint and the investigation file are confidential; the charging document and the record considered at discipline are public. From the Board’s NRS/NAC compilation. Retrieved September 5, 2026.
Nevada State Contractors Board, May 2026 disciplinary hearing outcomes, An example of the monthly outcome PDFs. Cited to show outcomes are public, not as a list of firms; no firm from it is named here. Retrieved September 5, 2026.
Florida DBPR, Licensee search, Official verification portal (page timestamp 9/4/2026). License detail has a View License Complaint link. Roster and status retrieved; complaint pane not. Retrieved September 5, 2026.
Florida DBPR, Online Services FAQ, View License Complaint, “The only complaints that appear on this screen are complaints for which probable cause has been found or where the subject of the complaint has waived his/her right to confidentiality and complaints against unlicensed persons,” citing §455.225(10). Retrieved September 5, 2026.
Florida Statutes §455.225(10), Disciplinary proceedings, confidentiality, The complaint and investigation are confidential until 10 days after probable cause, or until the licensee waives confidentiality. Does not apply to actions against unlicensed persons under §455.228. Retrieved September 5, 2026.
North Carolina Licensing Board for General Contractors, contractor FAQ, “A complaint is a public record. The information that remains on the license record is the resulting Board decision. A disciplinary action will be disclosed upon request.” License required at $40,000 and above (G.S. 87-1). Retrieved September 5, 2026.
North Carolina Licensing Board for General Contractors, consumer FAQ, License required at $40,000 (G.S. 87-1). Search by license name, number or county. The Board cannot order repairs or reimbursement; the Recovery Fund is a last resort. Retrieved September 5, 2026.
North Carolina Licensing Board for General Contractors, license search, nclbgc.org/license-search/ redirects to the portal. Search fields: classification, license number, qualifier, company, name, phone, address. No discipline field. Retrieved September 5, 2026.
North Carolina Licensing Board for General Contractors, newsletter summaries, January–March 2026, Quarterly PDF of final decisions and consent orders. Cited to show the Board publishes summaries, not as a list of firms; no firm from it is named here. Retrieved September 5, 2026.
Texas Department of Licensing and Regulation, TDLR does not license residential general contractors. Texas records here are city registrations (San Antonio Contractor Connect; El Paso Accela), not TDLR. Retrieved September 5, 2026.

A license is the minimum. The quote is the job.

Nothing on this page recommends hiring anyone. If you have bids in hand, compare them on the same drawings, allowances and exclusions.

Compare your quotes Plan Your Remodel

HyreRemodel does not do remodeling work and takes no payment for placement, ranking or a favorable mention.

This page is not a license verification for a specific job, a recommendation to hire, or legal advice. Check the issuing board and your building department.

A snapshot from August 2026 is not a statement about a company’s standing today.