HyreRemodel

Texas · Local markets

Remodeling contractors in Texas

How to check a Texas remodeler when the state issues no license: the city registers in San Antonio and El Paso, the licensed trades, and the Property Code protections. Records measured September 5, 2026.

Updated September 5, 2026 · Data as of September 5, 2026

Written by HyreRemodel Research Desk Primary-source research and fact checking

0 state general-contractor licenses TDLR issues no residential GC credential
955 city registrations in our records 805 San Antonio + 150 El Paso, measured September 5, 2026
$170 for two years San Antonio residential building contractor registration
10% retainage the owner must hold Tex. Prop. Code § 53.101, for 30 days after completion

The finding

Texas does not license residential general contractors. TDLR licenses electricians and air-conditioning contractors, TSBPE licenses plumbers, and the Texas Residential Construction Commission that registered builders was abolished in 2009.

So check a remodeler with the city that will inspect the work. Our 955 Texas records are city registrations (805 San Antonio, 150 El Paso), not a statewide list. Then look up the trades and use Property Code Chapter 53.

A Texas registration is not a Florida license

Florida’s Construction Industry Licensing Board issues examined credentials, and our records hold 7,130 of them. A Florida CGC, CBC or CRC number is state permission to contract.

A San Antonio “City Residential Building Contractor” number or an El Paso “Contractor General” registration is one city’s permission to pull permits in that city. It was not issued on a trade exam and means nothing in the next city.

Counting the two as the same kind of number is the mistake this page exists to prevent. No Texas state license is a fact about Texas, not a finding about any company.

Why “what’s your license number?” has no answer in Texas

In a licensing state the first question is the license number. In Texas there is no state answer for a remodeler. The Occupations Code licenses the trades a remodeler hires: electricians (Chapter 1305) and air-conditioning and refrigeration contractors (Chapter 1302) through TDLR, and plumbers (Chapter 1301) through the Texas State Board of Plumbing Examiners.

TDLR’s “at a glance” list of 41 programs (FY 2025) includes electricians, ACR contractors, mold assessors, elevator contractors and industrialized housing. General contracting is not on it.

That is not an oversight. The last statewide builder registry, the Texas Residential Construction Commission, ended after the 81st Legislature declined to continue it. The Sunset Commission’s 2009 final report recommended repealing the TRCC Act, and no successor board was created. Builders stayed subject to city permitting; they did not become state licensees.

So the rule that matters is local, and it differs by city. San Antonio requires a registered residential building or home-improvement contractor before it issues a permit for that work.

El Paso requires a General Contractor registration, with a blanket construction bond and a liability certificate on file, before its One Stop Shop issues a building permit.

Houston, Dallas, Austin and unincorporated counties each run their own counter, and a registration in one city does not carry to the next.

Ask a Texas remodeler three narrower questions instead: (1) are you registered with the city that will inspect this job, and what is the number.

(2) who holds the TDLR or TSBPE license for the electrical, HVAC or plumbing work; (3) will you give me the Tex. Prop. Code § 53.255 disclosure and a current certificate of insurance before I sign?

What our records hold for Texas

All 955 Texas files are city registrations. San Antonio’s categories (Minor Repairs, Fences, Roofing, Additions, New Homes, Pools and Spas, Foundations) are Contractor Connect types of work a registrant ticks, not license classes. El Paso’s class is “Contractor General.” Neither is a TDLR class, because TDLR has none for this work.

The 150 company records are El Paso firms that met the standard we use where a state issues no license: an active city registration whose rules require liability insurance, in most cases matched to a Comptroller taxpayer number. That is a different claim from a verified Florida DBPR license.

The Comptroller’s Active Sales Tax Permit Holders file is a third, weaker layer, kept out of those counts. On August 29, 2026, 3,443 outlet rows carried self-reported NAICS 236118 (Residential Remodelers); across ten construction and finish codes the file held 9,012 outlet rows and 8,608 distinct taxpayers.

A 236118 code is an industry label the taxpayer chose. It verifies no service and no insurance, and it is not a count of remodelers. An older plan figure of 3,644 was a stale cut of this file and is not published.

955 Texas registration files All from cities. Measured September 5, 2026
805 San Antonio Contractor Connect Retrieved August 29, 2026
150 El Paso Accela, Contractor General Retrieved August 29, 2026
150 Texas company records All El Paso, verified by the city standard
San Antonio Contractor Connect805
City registration
El Paso Accela city registration150
City registration
TDLR residential general contractor0
The credential does not exist

City registrations in our records, measured September 5, 2026. The zero is not a gap in our search: TDLR does not issue the credential.

What registration costs in San Antonio and El Paso

RequirementSan AntonioEl Paso
What the city issuesResidential Building Contractor or Home Improvement Contractor registrationCity contractor registration, class Contractor General
Registration fee$170 / two years (residential building); $150 / two years (home improvement)$100 a year plus a technology fee (Rev. 07/2024 schedule)
BondNone for residential registration$50,000 blanket building construction bond
Liability insurance, city as certificate holderHome improvement: $300,000 per occurrence / $600,000 aggregate / $300,000 products. Residential building: $500,000 / $1,000,000 / $500,000At least $100,000 on the application; the schedule’s note sets $250,000 bodily injury per person / $500,000 aggregate and $100,000 property damage per occurrence and aggregate
OtherFBI background check. Residential building: ICC residential certification or a Building Official-approved equivalentAssumed-name or corporate documents. Electrical, mechanical and plumbing registrants file a state license instead of the bond
Where it countsInside the City of San Antonio, for the work the class coversInside the City of El Paso, for work the General Contractor class covers

San Antonio figures from the Development Services “Building & Home Improvement” page and San Antonio Code of Ordinances § 10-115(h); El Paso figures from Planning and Inspections, Contractor Registration Requirements, Rev. 07/2024. Both retrieved September 5, 2026.

A registration fee is not a permit fee; the job’s permit is a separate charge at the same counter. HyreRemodel does not pull permits, and this table is not a quote.

What those fees buy, and what they do not

San Antonio’s $170 two-year residential-building registration is written in the ordinance and on the department’s page, and it is the price of pulling a structural remodel permit there.

On September 5, 2026 the Development Services page still read: home improvement $150 for two years, residential building $170 for two years, and commercial general contractors “no license or registration requirements.”

The $170 is not an exam score. Information Bulletin 236 (revised November 10, 2025) sets three Contractor Connect categories. Registered requires the fee, a code-of-ethics acknowledgment, liability insurance and an FBI background check.

Registered Plus adds current permit fees, no verified building-related infractions and two DSD training events a year. Premier adds Residential ICC certification or an approved equivalent. None is a state license.

El Paso’s $100 a year plus a $50,000 bond is the price of being on the Accela register the One Stop Shop checks before issuing a building permit.

On September 5, 2026 the Rev. 07/2024 sheet still listed, for general contractors: business documents, the application, a liability certificate with at least $100,000 naming the city, the $50,000 bond, and “$100 Annual Fee + Tech Fee.”

The 2024 schedule raised the general-contractor bond from $25,000 on the 2020 sheet; use the 2024 figure.

An Issued Accela registration shows the city held a certificate and a bond when it registered the firm.

The register does not show the carrier, limits or policy dates, so it is not proof of current coverage. Ask for the certificate.

Neither fee applies statewide. An Austin remodeler registered with Austin does not appear in San Antonio’s Contractor Connect. That is how the Texas market is built, not a gap we can fill by pretending TDLR has a lookup.

The two cities also charge the licensed trades differently. El Paso charges electrical, mechanical and plumbing registrants no annual fee; they file the state license instead of the bond.

San Antonio registers a state plumber license free, and a state mechanical or TCEQ irrigator license for $85 a year. The remodeler’s fee buys the building permit; the trades’ fees buy the trade permits.

How to check a remodeling contractor in Texas

1
Find the city that will inspect the work

The registration that matters is at the counter that issues the permit. We hold San Antonio’s and El Paso’s registers; for any other Texas city, start at its building department, not TDLR. An El Paso number cannot pull a San Antonio permit.

2
Look the firm up on that city’s register

El Paso: Accela Citizen Access, Licenses, record type City Registration License, license type Contractor General. San Antonio: Contractor Connect, by company name or registration number (HIC-, RBC- or H- prefix). Match the legal business name, not the name on the truck, and read the expiration date.

3
Do not expect a TDLR number for the remodeler

There is none. TDLR’s FY 2025 summary lists 41 programs and 1,020,822 licensees, including 227,117 electricians and 60,552 air-conditioning and refrigeration licensees, but no general contractors. An empty TDLR search for a remodeler is normal.

4
Look up the trades Texas does license

Search TDLR for the electrician (program ELC) and the ACR contractor (Chapter 1302). Search TSBPE’s Public License Search for the plumber: choose the Plumbing Board, then “Plumbing – Licensed or Registered.” Ask the remodeler to name the Responsible Master Plumber. Search TCEQ for any irrigation installer.

5
Confirm the business with the Comptroller

The Active Sales Tax Permit Holders file is public. A taxpayer number with a right-to-transact code of A is evidence the business is registered. A sole proprietor selling only services may have no permit, so treat a miss as unknown, not as “not registered.”

6
Collect the Chapter 53 documents

Tex. Prop. Code § 53.255 requires the contractor to give you a statutory disclosure before you sign. Section 53.256 requires a list of subcontractors and suppliers unless you waive it in the statute’s 10-point bold form. Also get a current insurance certificate naming you and the city registration number written into the contract.

7
Hold back 10 percent

Section 53.101 requires the owner to reserve 10 percent of the contract price, or of the value of the work, during construction and for 30 days after completion. Under § 53.105, if you do not, subcontractors who followed the statute can lien the house for the amount you should have held.

8
On a homestead, sign the written contract first

Under § 53.254, a lien attaches to a homestead only if a written contract is signed before work starts, by both spouses if the owner is married, and filed with the county clerk. A handshake remodel can leave both you and an unpaid subcontractor without the statute’s protection.

Worked lookups: what the city screens show

We reopened two El Paso Accela records on September 5, 2026. These are examples of the checking route, not a recommendation. San Antonio’s Contractor Connect is a search form, so its lasting identifier is the registration number.

El Paso Accela: Complete Remodeling of El Paso, Inc.

In Accela Citizen Access, Licenses, search record type City Registration License. Record LCCR19-00259 on September 5, 2026: status Issued, expiration 08/11/2027, work location 4701 Guadalupe Dr, El Paso, TX 79904; licensed professional Samantha Abshagen; class Contractor General (19-LP-00302). “Term of License: 1 Year” matches the $100 annual fee.

The screen does not show the insurer, policy number, bond surety or any discipline. An Issued record is not current insurance. Match the legal name to the Comptroller taxpayer (32070250116) and Secretary of State file (0803280524) before treating it as the firm at your door.

El Paso Accela: L.E. Builders & Remodeling LLC

Same register, record LCCR25-00297, on September 5, 2026: status Issued, expiration 08/03/2027, work location 110 Maryland, El Paso, TX 79905; licensed professional Laura Najera, L.E. Builders & Remodeling LLC, 110 N Maryland; class Contractor General (25-LP-00342). Term of License: 1 Year.

Screenshot the record page, including the expiration date, before you sign. Accela does not provide the insurance certificate, so ask the firm for one naming you, dated for the project, with the City of El Paso still listed if they are pulling the permit.

San Antonio Contractor Connect: GDK Remodeling LLC

Search registration number RBC-21-01911 or the name GDK Remodeling LLC. Our August 29, 2026 record: status Registered, City Residential Building Contractor, expires January 5, 2028, qualifier Gregory Kachikis, 135 Palo Pinto, San Antonio, TX 78232; types of work Additions, Fences, Foundations, Minor Repairs, New Homes, Pools and Spas, Roofing.

An RBC- prefix is the $170 residential building class San Antonio requires for structural remodels, additions and foundation repairs. An HIC- prefix is the $150 home-improvement class for non-structural work. They are not interchangeable, and the Registered / Registered Plus / Premier labels are still not a TDLR credential.

Trades: TDLR electrician and ACR, TSBPE plumber

On TDLR’s search, program ELC, look for an active Electrical Contractor with an assigned Master Electrician: Occupations Code § 1305.151 bars non-exempt electrical work without the right license.

§ 1302.251 requires an ACR contractor license for AC work; it is valid statewide and needs no city ACR license, though San Antonio still registers it ($85 a year) before issuing a mechanical permit.

On TSBPE’s Public License Search, search by name or by number without the rank letter (“99999,” not “M99999”). § 1301.351(a-2) requires anyone offering plumbing to secure a Responsible Master Plumber.

A miss on TDLR or TSBPE for someone who will open a panel, condenser or drain is a real red flag; a TDLR miss for the remodeler is not.

Three firms, and the public record we opened for each

Examples of the checking route only. In no particular order, not ranked, not recommended, and not a finding that any firm is currently insured.

Firm and qualifierCityRegistrationStatusPublic record
Complete Remodeling of El Paso, Inc.
Samantha Abshagen
El PasoLCCR19-00259
Contractor General
Issued
Expires August 11, 2027
Open the register
L.E. Builders & Remodeling LLC
Laura Najera
El PasoLCCR25-00297
Contractor General
Issued
Expires August 3, 2027
Open the register
GDK Remodeling LLC
Gregory Kachikis
San AntonioRBC-21-01911
City Residential Building Contractor
Registered
Expires January 5, 2028
Open the register

El Paso records reopened on Accela Citizen Access on September 5, 2026: Issued, unexpired, Contractor General. GDK Remodeling LLC is from our August 29, 2026 pull of San Antonio’s Contractor Connect, searchable by RBC-21-01911.

We name a firm only where we can point to a live or retrieved city record. We have no Houston, Dallas or Austin records and will not invent them.

What Texas does license, and where to check

WorkState license?Agency and statuteLookup
Residential general contracting / remodelingNoNone. TRCC abolished 2009; TDLR’s FY 2025 list of 41 programs does not include itThe city register where the work is
ElectricalYesTDLR, Occupations Code § 1305.151: no non-exempt electrical work without the right licenseTDLR ELC search
Air conditioning and refrigerationYesTDLR, Occupations Code § 1302.251: the ACR contractor license is valid statewide, with no city ACR license required on topTDLR license search
PlumbingYesTSBPE, Occupations Code § 1301.351: offering plumbing requires a Responsible Master PlumberTSBPE Public License Search
Landscape irrigationYesTCEQ Landscape Irrigator license. Application fee $111; exam minimum 70 percent per sectionTCEQ irrigator license
Mold assessment / remediationYesTDLR, one of the 41 FY 2025 programs (5,646 licensees). Not a GC licenseTDLR license search
Roofing on its ownNoNone statewide. San Antonio treats roofing as a Contractor Connect type of work under residential registrationCity registration and permit history

TDLR at a Glance (FY 2025) and Occupations Code chapters retrieved September 5, 2026. The TDLR counts (electricians 227,117; ACR 60,552; mold 5,646) are statewide trade licenses, not remodelers.

A remodeler can lawfully bid a job that includes these trades without holding the licenses, because the licensed subcontractor is who the statute regulates.

That is why the § 53.256 subcontractor list matters: it is how you find the TDLR and TSBPE numbers on your job.

As of September 1, 2025, TDLR also licenses residential solar retailers; general contracting is still absent.

How the two cities register the state trades

Trade at the counterSan AntonioEl Paso
Remodeler / residential GC$170 / two years (residential building) or $150 / two years (home improvement). FBI check. RBC class: ICC residential certification or approved equivalent. No state GC license to file.$100 a year + tech fee. $50,000 blanket construction bond. Liability certificate naming the city. No state GC license to file.
ElectricalRegister the TDLR electrical contractor and master licenses to pull a permit. The city no longer issues its own electrical contractor license; legacy city licenses renew at $300 / two years. Certificate: $300,000 bodily injury and $300,000 property damage, city as holder.No annual fee. File the TDLR electrical contractor and master electrician licenses; the master’s TDLR profile must show the business name. No bond.
Mechanical / ACRRegister the TDLR mechanical license: $85 / year, photo ID, license card, insurance certificate. Legacy city licenses renew at $150 / year with eight hours of CE. ACR Class A/B insurance is set by TDLR (16 TAC § 75.40), not the city.No annual fee. File the TDLR mechanical master; the profile must show the business name. No bond.
PlumbingRegister the TSBPE plumber license: no fee. Photo ID, license card, current insurance on file with TSBPE, renewed yearly. Medical-gas and multipurpose residential fire-sprinkler endorsements needed for those permits.No annual fee. File the master plumbing license; the board site must show the insurance expiration and business name. No bond.
Landscape irrigationRegister the TCEQ irrigator license: $85 / year, photo ID, license card, insurance certificate or bond. A licensed plumber may get an irrigation permit.$100 a year + tech fee as an irrigation contractor, plus the state irrigator license. A $10,000 blanket bond can cover irrigation work under the limited-bond list.

San Antonio figures from the DSD Electrical, Mechanical, Plumbing and Building & Home Improvement pages; El Paso from Contractor Registration Requirements, Rev. 07/2024. Retrieved September 5, 2026. A city registration of a state license is not a second state license.

These are the prices of being allowed to pull a permit, not a quote for your job.

When a Texas remodel goes wrong: liens and retainage, not a board complaint

There is no TDLR complaint to file against an unlicensed general contractor, because the license does not exist. In Texas, getting money back is a property-law question, and national “check the license” advice misses that.

Property Code Chapter 53 is the mechanic’s-lien statute. Under § 53.021, anyone who supplies labor or materials under a contract with the owner, the owner’s agent, the contractor or a subcontractor can claim a lien, as can licensed architects, engineers, surveyors, landscapers and demolition crews.

The contractor you hired is not the only one who can put a claim on the house.

Before you sign a residential contract, § 53.255 requires the contractor to give you the statutory disclosure: that unpaid subcontractors can lien the house, that you should withhold against a written notice of claim, and that you should hold 10 percent for 30 days after completion.

Skipping it does not by itself cancel a lien (§ 53.255(c)), but you want it in your file before the first payment.

Section 53.101 sets retainage: during the work and for 30 days after completion, the owner holds 10 percent of the contract price, or of the value of the work. On a $75,000 contract that is $7,500, a statutory illustration, not a quote or a typical Texas remodel cost.

Skip it and § 53.105 applies: subcontractors who followed the statute have a lien against the house and lot at least for the amount that should have been held. The 10 percent is the protection Texas built instead of a licensing board.

Section 53.256 requires a written list of subcontractors and suppliers (name, address, phone) before work starts, updated within 15 days of any change, unless you waive it in the statute’s 10-point bold form. That waiver “may not be canceled at a later date,” so do not initial it because it was in the stack.

A homestead has a second gate (§ 53.254): a written contract signed before any work or materials, by both spouses if married, and filed with the county clerk.

A lien affidavit on a homestead must carry, in at least 10-point bold at the top: “NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN.”

Filing deadlines after House Bill 2237 (effective January 1, 2022): on a residential project, the original contractor files the lien affidavit by the 15th day of the third month after the month its work was completed, terminated or abandoned (§ 53.052(a)(2)).

Subcontractors and suppliers on a residential project have the same third-month window, counted from their last labor or materials, or the date specially fabricated materials would have been delivered (§ 53.052(c)). A retainage claimant other than the original contractor files by the 15th day of the third month after the original contract ended (§ 53.052(d)).

At final payment, § 53.259 requires the contractor to sign a bills-paid affidavit: either everyone has been paid in full, or who is still owed, how much, and their contact details.

A knowingly or recklessly false affidavit is a misdemeanor (a fine up to $4,000, up to a year in jail, or both), and the signer is personally liable. A “paid in full” stamp on an invoice is not the affidavit.

Defect claims against a builder fall under the Residential Construction Liability Act (Property Code Chapter 27), a notice-and-chance-to-repair statute. Deceptive practices fall under the DTPA. None of this is legal advice: a Texas construction lawyer applies Chapter 53 or Chapter 27 to a specific job.

Chapter 53 in the order you meet it

SectionWhat it requiresWhat it does not do
§ 53.255The contractor delivers the statutory disclosure before you sign a residential construction contract.Missing it does not cancel a lien (§ 53.255(c)).
§ 53.256A written list of subcontractors and suppliers (name, address, phone) before work starts; updated within 15 days of any change.You can waive it only in the statute’s 10-point bold form, and the waiver cannot later be canceled.
§ 53.101The owner holds 10 percent of the contract price, or of the value of the work, during construction and for 30 days after completion.It is not a penalty and not a favor from the contractor.
§ 53.105If the owner does not hold it, complying claimants have a lien at least for the amount that should have been held.It is not a TDLR fine. There is no board to call.
§ 53.254To place a lien on a homestead: written contract before work, both spouses if married, filed with the county clerk.A handshake remodel on a homestead can leave both owner and unpaid subcontractor unprotected.
§ 53.052Residential original contractor: lien affidavit by the 15th day of the third month after completion, termination or abandonment. Subcontractors have a parallel window.An affidavit is not itself a lien, as the homestead notice says in 10-point bold.
§ 53.259A bills-paid affidavit as a condition of final payment. False statement: misdemeanor, fine up to $4,000 or up to a year in jail, plus personal liability.A “paid in full” stamp on an invoice is not the affidavit.

Tex. Prop. Code Chapter 53, retrieved September 5, 2026 from statutes.capitol.texas.gov and cross-checked on texas.public.law (verified there to May 26, 2025). House Bill 2237 amended several sections effective January 1, 2022. A map, not legal advice.

What to get in writing before you sign

The city registration number, class and expiration

For the city where the work is. Not “licensed and insured”: the number, the city, the date it lapses.

TDLR and TSBPE numbers for the electrical, HVAC and plumbing work

Look each one up. A remodeler who cannot name the electrician is asking you to let an unknown person open your panel.

The § 53.255 disclosure and the § 53.256 subcontractor list

Signed and dated. A contractor who has never heard of either section has told you something useful.

A current insurance certificate naming you

The city register does not show the policy; the certificate does. An expired registration is cheaper to discover now than after a loss.

A retainage clause that holds 10 percent

Write the dollar figure. Section 53.101 is 10 percent of the price or of the value of the work, held during construction and 30 days after. Section 53.105 is what happens if the money is gone.

On a homestead: a written contract signed by both spouses and filed

Section 53.254, before anyone starts. A start date in a text thread is not that contract.

A bills-paid affidavit at final payment

Section 53.259. If it lists anyone still unpaid, hold that amount until you have a release from that person.

Who pulls the permit, in which city, under which registration

A contractor who wants you to pull it as owner-builder is moving the city’s enforcement from themselves to you. That can be legitimate, but it should not be the default.

How we built this page, and its limits

Texas counts come from the license files in data/remodeling-data/licenses/ with state TX, measured September 5, 2026; authority names are taken from the files, and company counts from company-states/. The two El Paso Accela records were reopened on September 5, 2026: LCCR19-00259 Issued, expires August 11, 2027; LCCR25-00297 Issued, expires August 3, 2027.

San Antonio’s Contractor Connect has no per-firm URL, so GDK Remodeling LLC is cited from our August 29, 2026 pull.

San Antonio fees, insurance minimums and trade fees were re-read from the DSD Building & Home Improvement, Electrical, Mechanical and Plumbing pages on September 5, 2026; El Paso’s from the Rev. 07/2024 requirements sheet the same day.

Comptroller counts come from our August 29, 2026 pull of the public Active Sales Tax Permit Holders dataset. Occupations Code and Property Code citations were retrieved from statutes.capitol.texas.gov on September 5, 2026 and cross-checked on texas.public.law (verified there to May 26, 2025).

The limits: our Texas records cover two cities, not 254 counties. Houston, Dallas, Austin, Fort Worth, unincorporated Harris County and every other permitting authority are outside them, which says nothing about firms that work there.

Texas discipline fields are empty because we have not retrieved any city discipline feed. An Issued Accela record is not current insurance, and a “Registered” Contractor Connect record is not an examined license.

This page does not rank contractors or score reviews. The 50-state study of where no contractor license exists is states without contractor licensing; every state’s lookup is in the license lookup directory. HyreRemodel does not remodel homes, pull permits or take a fee to list a firm.

Questions

Does Texas require a license to be a remodeling contractor?
No. Texas issues no state license for residential general contractors or remodelers. TDLR licenses electricians and AC contractors, and TSBPE licenses plumbers. Cities such as San Antonio and El Paso require a city registration before issuing a building permit. Check the remodeler with the city where the work is, not with TDLR.
How do I check a remodeling contractor in Texas?
Look the firm up on the register of the city that will inspect the work (San Antonio Contractor Connect, El Paso Accela, or your city’s building department). Look up the electrician, HVAC contractor and plumber at TDLR or TSBPE. Confirm the business with the Comptroller, and get the § 53.255 disclosure, subcontractor list and an insurance certificate before signing.
Why isn’t there a TDLR number for my remodeler?
Because TDLR does not license that job. An empty TDLR search for a general contractor is the expected result. Search TDLR for the trades inside the remodel, and search the city register for the remodeler.
Is a San Antonio or El Paso registration the same as a Florida contractor license?
No. A Florida CGC, CBC or CRC is an examined state license to contract. A San Antonio or El Paso registration is one city’s permission to pull permits there, issued against insurance (and in El Paso a bond), not a trade exam. The two counts in our records are different kinds of numbers.
What if the work is outside San Antonio and El Paso?
We do not hold that city’s register, but the method is the same: the building department that will inspect the work, TDLR and TSBPE for the licensed trades, the Comptroller for the business, and the Chapter 53 disclosure. We do not build a Houston or Dallas list from San Antonio records.
Does HyreRemodel remodel homes in Texas?
No. HyreRemodel publishes research and is building a service to introduce homeowners to contractors; that matching is not live yet. We do no remodeling, pull no permits and take no fee to rank a company. A firm named on this page is a public-record example of how to check, not an endorsement.
Do I have to hold back 10 percent on a Texas remodel?
Yes, under Property Code § 53.101: the owner holds 10 percent of the contract price, or of the value of the work, during construction and for 30 days after completion. If you do not, § 53.105 lets complying subcontractors lien the house for the amount you should have held. A Texas construction lawyer can apply this to your job.
Can a subcontractor put a lien on my house if I already paid the remodeler?
Yes. Section 53.021 lets anyone who supplied labor or materials under the contractor or a subcontractor claim a lien, even if you never hired them. Get the § 53.256 subcontractor list, hold the 10 percent, and release it only against a § 53.259 bills-paid affidavit and a signed release from anyone who sent a notice of claim.
Is electrical, HVAC or plumbing work licensed in Texas even though the remodeler is not?
Yes. Occupations Code § 1305.151 requires a TDLR license for non-exempt electrical work, § 1302.251 a TDLR ACR contractor license (valid statewide), and § 1301.351 a TSBPE plumbing license with a Responsible Master Plumber. Look up those trades on your job; do not look up the remodeler at TDLR.
How much does it cost to register as a remodeler in San Antonio or El Paso?
San Antonio: $170 for two years (residential building) or $150 for two years (home improvement), per its Development Services page on September 5, 2026. El Paso: $100 a year plus a technology fee and a $50,000 blanket construction bond (Rev. 07/2024 sheet). These are registration fees, not permit fees or a job quote.

Written and audited by

HyreRemodel Research Desk

Primary-source research, data analysis and fact checking

We are a research desk, not a remodeling contractor and not a sales floor.

We read the statute, the licensing register or the municipal fee schedule ourselves, and we publish the figure with the document it came from and the date we retrieved it.

Where a number cannot be traced to a primary source, we publish the shorter page and say what we could not verify.

This program is new, and the counts below are small: they are what we have actually published, not what we intend to.

7
studies published
7
states in the contractor store we measure against
264
source documents linked from these pages, 101 of them on .gov domains
22,183
license records measured September 5, 2026

How this desk works

  • Primary sources only. Licensing facts come from the issuing board or the statute that creates the credential. Permit-fee facts come from the municipality that publishes the schedule. We do not cite an article that cites a source; we open the source and record the date.
  • Our own store is titled to the states it covers. We hold verified contractor records for seven states. An asset that rests on those records is titled to those states. National claims rest on federal or state-agency data (Census, BLS, EPA), never on our counts.
  • Absence of a record is not a finding about the company. A board that does not publish disciplinary history in a form we retrieved is excluded from any “clean record” claim. Unable to verify is not unlicensed. Not required is not not carried.
  • Fact, calculation, analysis and recommendation stay labelled. A statute is a source fact. A count we derived from our store is a HyreRemodel calculation. What that count means is analysis. What a homeowner should do next is a recommendation.
  • We do not remodel homes, and we take no payment for placement, ranking or a favorable mention. Nobody buys a position on this site.

Data as of September 5, 2026. Authorship on this site is organizational: the analysis belongs to the desk rather than to a named individual, and we do not publish credentials we do not hold. Our editorial policy sets out how we source, date and correct what we publish.

Sources & retrieval dates

Texas Department of Licensing and Regulation, TDLR at a Glance, 41 programs; 1,020,822 licensees, FY 2025. Electricians 227,117; ACR contractors 60,552; mold assessors and remediators 5,646. General contracting not listed. Residential solar retailers added September 1, 2025. Retrieved September 5, 2026.
TDLR, Electricians program, Anyone who performs or offers non-exempt electrical work must be licensed and work through a licensed electrical contractor. Retrieved September 5, 2026.
TDLR, Air Conditioning and Refrigeration Contractors program, Contractors who install, repair or maintain ACR or heating systems must hold a TDLR license; ACR companies must employ an ACR contractor at each permanent location. Retrieved September 5, 2026.
Tex. Occ. Code § 1305.151, License required (electricians), A person or business may not perform or offer electrical work without an appropriate Chapter 1305 license. Retrieved September 5, 2026.
Tex. Occ. Code § 1302.251, License required (ACR contractors), No ACR contracting without an ACR contractor license. The license is valid statewide; no municipal ACR license is required on top (§ 1302.251(b)). Retrieved September 5, 2026.
Tex. Occ. Code § 1301.351, License, endorsement or registration required (plumbers), No plumbing without the proper TSBPE credential. Anyone who advertises or offers plumbing must secure a Responsible Master Plumber (§ 1301.351(a-2)). Retrieved September 5, 2026.
City of San Antonio Development Services, Electrical, State electrical license must be registered to pull a permit; the city no longer issues electrical contractor licenses. Legacy city licenses $300 / two years. Insurance $300,000 BI / $300,000 PD, city as holder. Retrieved September 5, 2026.
City of San Antonio Development Services, Mechanical, State mechanical license registration $85 / year; the city no longer issues mechanical contractor licenses. Legacy city licenses $150 / year with eight hours CE. ACR Class A/B insurance is TDLR 16 TAC § 75.40. Retrieved September 5, 2026.
City of San Antonio Development Services, Plumbing, State plumber license registration free; photo ID, license card, current insurance on file with TSBPE; renewed yearly. TCEQ irrigator registration $85 / year. Retrieved September 5, 2026.
TCEQ, Landscape Irrigator, Irrigation Technician and Irrigation Inspector, Occupational license. Application fee $111; exam minimum 70 percent per section. A Landscape Irrigator may sell, design, install, maintain, alter, repair or service an irrigation system. Retrieved September 5, 2026.
TSBPE Public License Search, Choose Texas State Board of Plumbing Examiners, then Plumbing – Licensed or Registered. Search by number without the rank letter. Retrieved September 5, 2026.
Tex. Occ. Code Chapter 1302, Air Conditioning and Refrigeration Contractor License Law, Creates the ACR contractor license TDLR administers. No parallel chapter creates a residential general-contractor license. Retrieved September 5, 2026.
Sunset Advisory Commission, Texas Residential Construction Commission Final Report, 81st Legislature (July 2009), Recommendation 1.1: abolish the TRCC and repeal the TRCC Act. No successor licensing board was created. Retrieved September 5, 2026.
City of San Antonio Development Services, Building & Home Improvement, Home improvement registration $150 / two years; residential building contractor $170 / two years; insurance minimums and FBI background check. Commercial general contractors: no city license or registration. Retrieved September 5, 2026.
San Antonio Code of Ordinances § 10-115(h), Fees; registration period, Home builder registration $170 for two years; home improvement registration $150 for two years. Retrieved September 5, 2026.
City of San Antonio, Information Bulletin 236, Contractor Connect Program (revised November 10, 2025), Registered / Registered Plus / Premier categories. Category 1 requires application and fee, code of ethics, general liability insurance and an FBI background check. Retrieved September 5, 2026.
City of San Antonio, Contractor Connect, Public search of registered residential building and home-improvement contractors. Retrieved September 5, 2026.
City of El Paso Planning and Inspections, Contractor Registration Requirements (Rev. 07/2024), General contractor: $100 annual fee plus tech fee, $50,000 blanket building construction bond, liability certificate with the City of El Paso as holder. Retrieved September 5, 2026.
City of El Paso, Accela Citizen Access, Licenses, Public register of city contractor registrations. LCCR19-00259 reopened September 5, 2026: Issued, expires August 11, 2027, Contractor General, 4701 Guadalupe Dr. LCCR25-00297 reopened the same day: Issued, expires August 3, 2027, Contractor General, 110 Maryland. Retrieved September 5, 2026.
Tex. Prop. Code § 53.255, Disclosure statement required for residential construction contract, The original contractor must deliver the statutory disclosure before the owner signs a residential construction contract. Failure to comply does not invalidate a lien. Retrieved September 5, 2026.
Tex. Prop. Code § 53.256, List of subcontractors and suppliers, Name, address and phone of each subcontractor and supplier before construction starts; updated within 15 days of any change. Waiver only in the 10-point bold statutory form, and it may not later be canceled. Retrieved September 5, 2026.
Tex. Prop. Code § 53.021, Persons entitled to lien, Anyone who performs or furnishes labor or materials under a contract with the owner, the owner’s agent, contractor or subcontractor has a lien. Architects, engineers, surveyors, landscapers and demolition labor are listed separately. Retrieved September 5, 2026.
Tex. Prop. Code § 53.101, Funds required to be reserved, During the work and for 30 days after completion, the owner reserves 10 percent of the contract price or of the value of the work. Amended by Acts 2021, 87th Leg., R.S., ch. 690 (H.B. 2237), effective January 1, 2022. Retrieved September 5, 2026.
Tex. Prop. Code § 53.105, Owner’s liability for failure to reserve funds, If the owner fails to reserve, complying claimants have a lien at least for the amount that should have been reserved, against the improvements and the lot. Retrieved September 5, 2026.
Tex. Prop. Code § 53.052, Filing of affidavit, Residential original contractor: by the 15th day of the third month after the month the work was completed, terminated or abandoned. Parallel third-month window for derivative claimants. H.B. 2237, effective January 1, 2022. Retrieved September 5, 2026.
Tex. Prop. Code § 53.254, Contractual requirements for lien on homestead, Written contract before labor or materials; both spouses if married; filed with the county clerk where the homestead is. A homestead lien affidavit must carry the 10-point bold “THIS IS NOT A LIEN” notice. Retrieved September 5, 2026.
Tex. Prop. Code § 53.259, Final bills-paid affidavit required, A condition of final payment on a residential construction contract. A false statement is a misdemeanor (fine up to $4,000, up to one year in jail, or both), and the signer is personally liable for loss from false or incorrect information. Retrieved September 5, 2026.
Texas Comptroller of Public Accounts, Active Sales Tax Permit Holders, 3,443 outlet rows coded NAICS 236118 (Residential Remodelers) in our August 29, 2026 pull. A self-reported industry code, not a verified remodeler count. Retrieved August 29, 2026.
HyreRemodel contractor verification store, 955 Texas city registration files (805 San Antonio, 150 El Paso) and 150 Texas company records, all verified by the city-registration standard. Measured September 5, 2026 from data/remodeling-data/. Retrieved September 5, 2026.

Comparing bids on a Texas remodel

A city registration is the minimum. The worksheet shows whether three quotes describe the same job, who is pulling the permit, and whether the licensed trades are named.

Compare your quotes Plan Your Remodel

HyreRemodel does not do remodeling work. Nothing on this page is a quote, a license verification for a specific job, legal advice or an endorsement of a named firm.

Check with the city that will inspect the work, the board for any licensed trade, and the documents Chapter 53 requires. Insurance on a city register shows the city held a certificate at registration, not that coverage is current.