Quick answer
A roof truss is a prefabricated, engineered frame of lumber pieces joined into triangles, usually with metal connector plates, that spans from one bearing wall to another and carries the roof and often the ceiling below.
Each truss is designed for one building and one set of loads. Its design drawing travels with it to the site, and the code says no part of it may be cut, notched, drilled or altered without a registered design professional’s approval.
Quick facts
The key facts about Roof Truss, with sources:
- Main parts
- Top chord, bottom chord, webs, connector plates, heel 2
- Paperwork
- A truss design drawing approved before installation and shipped with the trusses 1
- Bearing
- Every truss needs at least two bearings 2
- Alterations
- Not allowed without a registered design professional’s approval 1
- Common lumber
- Most webs are 2x4; chords are often 2x4 or 2x6 2
Key takeaways
- A roof truss is engineered as a whole; every chord, web and plate is part of the design.
- The 2021 IRC bans cutting, notching, drilling or splicing a truss without a registered design professional’s approval.
- Trusses often span the full width of a house, so interior walls below may not be load-bearing, but you must confirm that.
- Adding heavy loads, such as an HVAC unit or storage, needs a check against the truss design.
- The truss design drawing is the key document for any remodel that touches the attic or ceiling.
What a roof truss is
Look up in most attics built in recent decades and you will see a row of identical triangle frames, spaced evenly, joined with flat metal plates. Those are roof trusses. A factory builds them to a computer design, a truck brings them to the site, and a crane or crew sets them on the walls.
The triangle is the key. A triangle cannot change shape without stretching or crushing one of its sides, so a truss turns the weight of the roof into simple push and pull forces in its members.
The Structural Building Components Association (SBCA) describes webs as the members that join the top and bottom chords into the triangular patterns typical of trusses, carrying mostly axial forces 2.
Because trusses are engineered, they are not like the lumber you buy at a store. Each one is designed for a specific span, pitch, spacing and load.
The design drawing that comes with the truss is part of the building’s record, and the code requires the building official to approve it before the trusses go up 1.
How a truss carries the roof
Loads flow through a truss in a fixed path. SBCA’s parts glossary describes each step 2.
- The top chord takes the roof. Sheathing, roofing, snow and wind press on the sloped top chords.
- Webs pass the force down. Webs carry the load to the chords as push or pull along their length.
- Connector plates hold every joint. Each panel point, where webs meet chords, is joined with metal connector plates.
- The bottom chord holds the ends together. It usually works in tension and bending, stopping the walls from being pushed apart; it often carries the ceiling too.
- The heel and bearings pass loads to the walls. Every truss needs at least two bearings strong enough to carry the reactions down to the foundation.
- Top chordSloped member under the roof
- Bottom chordTie that usually carries the ceiling
- WebsInner members forming triangles
- Connector platesMetal plates at every joint
- HeelWhere top and bottom chords meet over the wall
- BearingsWalls or beams that hold the truss up
Every part is sized in the truss design. Removing or cutting one changes how the rest carry load. Source: [2]
Take away any one piece and the load path breaks. That is why cutting a single web to make room for a duct or attic stair can overload the rest of the truss.
Common types of roof trusses
| Type | Shape and use | Remodeling note |
|---|---|---|
| Common (standard) truss | Triangle with a peak and a flat bottom chord | Webs fill the attic, so little usable space |
| Scissors truss | Sloped bottom chord for a vaulted ceiling 2 | Ceiling shape is set by the truss |
| Attic truss | Open center with a bottom chord designed for live load 2 | Built for a room or storage; ordinary trusses are not |
| Hip truss set | Stepped trusses with flat tops that form a hip roof 3 | Often includes a girder truss carrying others |
| Mono truss | Single slope with a vertical member at one end 3 | Common on sheds, porches and lean-to additions |
| Raised-heel (energy heel) truss | Taller heel over the wall for more insulation and ventilation 2 | Helps reach full attic insulation at the eaves |
| Girder truss | A carrying truss that supports other trusses 2 | Its bearing takes high loads; never alter it |
An attic truss is not an ordinary truss with plywood on it
Attic trusses have bottom chords designed for floor loads. Laying flooring across ordinary truss bottom chords and filling the space with storage adds load the design may not include. Check the truss drawing first.
Example: reading a truss design drawing before an attic project
This shows where a homeowner finds key facts on a truss design drawing. The list of required items is from 2021 IRC Section R802.10.1; the project is an example 1.
| Item on the drawing | What it tells you | Why it matters for the remodel |
|---|---|---|
| Slope or depth, span and spacing | Roof pitch, clear span and on-center spacing 1 | Confirms the drawing matches your trusses |
| Location of joints | Where panel points and plates are 1 | Shows which members carry load |
| Required bearing widths | How much wall each end needs 1 | Matters if a bearing wall below will change |
| Design loads | Including top chord live load and any bottom chord loads 1 | Tells you if storage or equipment was planned |
| Lateral restraint locations | Where permanent bracing must go 2 | Bracing must not be removed for new work |
| Example finding | Bottom chord designed for limited storage only | A finished attic room would need an engineer |
- Designer sets loads and layoutBuilding plans define spans and bearings
- Truss maker engineers each trussTo ANSI/TPI 1
- Building official approves drawingsBefore installation
- Trusses ship with drawingsDrawings go to the job site
- Crew sets and braces trussesPer drawings and BCSI
- Sheathing and roofing go onTrusses now act as a system
The truss design drawing links every step, which is why it matters years later during a remodel. Source: [1] [4]
If you cannot find the drawing, the building department may have it in the permit file, or the truss manufacturer may have a copy. Without it, an engineer must assess the trusses before any change.
Where trusses show up in a remodel
In the attic. Trusses decide whether you can add storage, run ducts or install a pull-down stair. ENERGY STAR advises walking only on joists or truss chords in an attic, never on bare ceiling drywall 6.
Under the ceiling. Because trusses often span wall to wall, interior walls below may not carry roof load. That can open up a layout, but only a professional should confirm it. See our load-bearing wall page before planning any wall removal.
On plans and permits. For an addition, new trusses need their own approved design drawings, and the tie-in to the old roof needs an engineered detail.
On a quote. A bid for attic work, a new HVAC unit in the attic or a skylight should say how the trusses will be protected or who engineered any change.
Find the truss drawing early
Ask the building department for the original permit file, which may include truss drawings. Having them before design starts saves time and engineering fees.
Benefits and limitations of roof trusses
Why builders use them
What trusses rule out
The biggest limit is attic space. Common trusses fill the attic with webs, so a bonus room, a vaulted ceiling or a dormer usually means new framing, not a simple change. That is engineering and permit work.
Trusses are also sensitive to added weight. The IRC says alterations that add load beyond the truss design, such as HVAC equipment or a water heater, are not permitted without verification that the truss can carry it 1.
Finally, a truss is only as strong as its bracing. SBCA notes temporary and permanent bracing are both required during and after installation, and that lateral restraints need their own bracing to work 2.
What drives the cost of truss work
We do not publish prices for trusses or framing. For a remodel, the cost drivers are the span, the truss type (attic and scissors trusses are more complex than common trusses), the number of trusses, crane or lift access, engineering for repairs or alterations, and the need to tie into an existing roof.
Repairing a cut or damaged truss adds an engineer’s repair design and the labor to install it.
Trusses have no fixed lifespan. Kept dry and unaltered, they last as long as the house. Water damage, cut members and overloads are what shorten their life. Budget engineering into any project that touches them; our remodeling cost guide explains how professional fees fit a budget.
How a remodel that touches trusses should be handled
This is the order of work. The engineering and structural steps belong to licensed professionals, under a permit.
- Locate the truss design drawings, or note that they are missing.
- Describe the change: a new opening, added equipment, attic storage or a new roof tie-in.
- Hire a registered design professional to evaluate and, if needed, design a repair or reinforcement 1.
- Apply for a permit with the engineered design; our permit checker helps you start.
- Have a licensed contractor do the work exactly as designed, with temporary bracing per the drawings and BCSI 14.
- Pass the framing inspection before closing the ceiling.
- Keep the repair drawings with your house records.
Looking after roof trusses
Trusses need no routine service, but a yearly attic look catches the problems that harm them.
- Check for roof leaks: stains, damp wood or mold on chords and webs.
- Look at the plates: plates should sit flat in the wood, not backed out or rusted.
- Leave bracing in place: never remove lateral braces to make room for storage or ducts.
- Keep loads light unless the drawing allows storage.
- Keep attic vents clear so moisture does not build up on the framing.
Warning signs and when to call an engineer
- A cut, notched or drilled truss member, often left by a past duct, plumbing or attic-stair job.
- Sagging roof lines or a ridge that dips between ends.
- Cracked drywall or dips in ceilings, which SBCA notes can follow when a bearing crushes under load 2.
- Plates pulling out of the wood, or split chords.
- Rot or long-term water stains on truss members.
Never cut or overload a truss
The 2021 IRC says truss members shall not be cut, notched, drilled, spliced or otherwise altered without a registered design professional’s approval. Do not remove webs for storage or ducts, and do not hang heavy equipment from trusses without an engineer’s check. In the attic, step only on framing members.
Any of these calls for a licensed structural engineer before more work is done. Do not try to repair a truss by adding lumber on your own; the fix must be designed.
What the 2021 IRC says about wood trusses
Design drawings (R802.10.1). Truss design drawings must be provided to and approved by the building official before installation, and shipped with the trusses to the job site. They must show, at a minimum, slope or depth, span and spacing, joint locations, required bearing widths and design loads 1.
Design (R802.10.2). Wood trusses shall be designed by accepted engineering practice, and metal-plate-connected wood trusses shall comply with ANSI/TPI 1. Drawings are prepared by a registered design professional where state law requires 15.
Bracing (R802.10.3). Trusses must be braced to prevent rotation and provide lateral stability per the construction documents and truss drawings, or, without specific requirements, per accepted industry practice such as the SBCA/TPI BCSI guide 14.
Alterations (R802.10.4). Truss members shall not be cut, notched, drilled, spliced or otherwise altered without the approval of a registered design professional, and added loads beyond the design, such as HVAC equipment or a water heater, need verification first 1.
Adoption. States and cities adopt the IRC on their own schedule and may amend it. Remodels of existing homes may also fall under the existing building code. Ask your building department which applies.
Roof truss vs. other roof and ceiling framing
| Framing | What it is | Main difference from a truss |
|---|---|---|
| Roof truss | Factory-engineered triangle frame 2 | The baseline; altered only with engineering approval |
| Rafter | A single sloped member cut and set on site | Stick framing leaves open attic space; rafters are often sized from code span tables |
| Ceiling joist | Horizontal member carrying the ceiling | In a truss, the bottom chord does this job |
| Engineered wood beam | A manufactured beam such as LVL | Can serve as a bearing or a girder for trusses |
| Structural header | A beam over a wall opening | Carries truss loads over doors and windows |
Truss roof
- Factory engineered
- Approved design drawing
- Often spans wall to wall
- Attic full of webs
- No cutting without engineer
Stick-framed roof
- Built on site from rafters and joists
- Often sized from code tables
- May need interior bearing walls
- Open attic space
- Changes still need design review
Myths about roof trusses
- Myth One cut web will not matter.
- Reality The IRC bans cutting any truss member without a registered design professional’s approval 1; every member is part of the design.
- Myth You can floor the attic and use it for storage.
- Reality Only if the truss design includes that load; attic trusses are built for it, ordinary trusses may not be 2.
- Myth If trusses span wall to wall, no interior wall is load-bearing.
- Reality Girder trusses, interior bearings and point loads can still sit on interior walls 2; confirm before removing any wall.
- Myth Bracing is only needed during construction.
- Reality Permanent bracing and lateral restraints stay in place for the life of the roof 21.
- Myth Adding a heavy unit in the attic is a plumbing or HVAC question.
- Reality The IRC requires verifying the truss can carry the added load first 1.
How snow, wind and local rules change truss design
Trusses are designed for local loads, so the regional variables are ground snow load and design wind speed.
The truss design drawing must list design loads, including top chord live load, which is based on the site 1.
That is why a truss from a warm, low-snow region cannot simply be copied for a mountain or northern home, and why an addition’s trusses are engineered for your address.
Local jurisdictions may also require truss drawings sealed by an engineer licensed in the state. Check with your building department.
When trusses should change your remodeling plan
Trusses matter whenever a project touches the attic or ceiling: a finished attic, a vaulted ceiling, a skylight, a dormer, a new attic HVAC unit, a whole-house fan or an addition that ties into the roof. In each case, plan for an engineer’s review before design is final.
They matter less for remodels that stay below the ceiling, though wall removal still needs a check of what the trusses bear on.
Your next step: find the truss drawings and share them with your designer or engineer at the first meeting.
- If Converting the attic to a room or heavy storage
- Then Yes; engineer review and likely new framing
- If Adding a skylight, attic stair or duct that hits a truss
- Then Yes; no cutting without approval
- If Putting HVAC equipment or a water heater in the attic
- Then Yes; verify the load first
- If Removing an interior wall
- Then Yes; confirm whether trusses or girders bear on it
Questions about Roof Truss
Can you cut a roof truss?
Not without approval. The 2021 IRC says truss members shall not be cut, notched, drilled, spliced or otherwise altered in any way without the approval of a registered design professional. If a past contractor cut one, have a structural engineer assess it and design a repair.
What is the difference between a truss and a rafter?
A truss is a factory-built frame of chords and webs joined in triangles and engineered for one building. A rafter is a single sloped board cut and set on site, usually paired with ceiling joists. Trusses can span wider without interior support, while rafter roofs leave more open attic space.
Can I store things in an attic with trusses?
Only within the load the truss design allows. Attic trusses are built with bottom chords designed for floor loads, but ordinary trusses may only allow limited storage, or none. Check the truss design drawing for bottom chord live load before adding flooring or heavy items.
Are interior walls load-bearing if the house has trusses?
Often not, because trusses usually span from outside wall to outside wall. But girder trusses, interior bearing points and point loads can land on interior walls. Never assume; have a structural engineer or the truss drawings confirm before removing any wall.
Can I convert a truss attic into a room?
Usually not without new structure. Common trusses fill the attic with webs and their bottom chords are not designed for living-space loads. A conversion typically means engineered reinforcement or replacing the trusses, plus a permit, egress, stairs and insulation work.
Where do I find my truss drawings?
Start with your building department, which may have them in the original permit file because the IRC requires approval before installation. The builder or truss manufacturer may also have copies. If none can be found, a structural engineer can evaluate the trusses in the field.
What are the parts of a roof truss called?
The main parts are the top chord, the bottom chord, the webs and the metal connector plates. The heel is where the top and bottom chords meet over the wall, panel points are where webs meet chords, and bearings are the walls or beams that support the truss.
Can I put an HVAC unit in a truss attic?
Only after checking the load. The 2021 IRC says alterations that add load beyond the truss design, naming HVAC equipment and water heaters, are not permitted without verification that the truss can carry it. Ask your HVAC contractor to coordinate with an engineer or the truss maker.
What is a raised-heel truss?
A raised-heel or energy heel truss is taller where it sits on the outside wall. SBCA says it raises the roof plane over the bearing to leave more room for insulation and ventilation at the eaves, which helps reach full attic insulation depth near the walls.
Sources
- ICC, 2021 International Residential Code, Chapter 8 Roof-Ceiling Construction (R802.10.1–R802.10.4), retrieved .
- Structural Building Components Association (SBCA), Roof Trusses: elements and terminology, retrieved .
- Structural Building Components Association (SBCA), Truss Configurations, retrieved .
- Structural Building Components Association (SBCA), Building Component Safety Information (BCSI) Guide, retrieved .
- Truss Plate Institute (TPI), standards for metal plate connected wood trusses, retrieved .
- ENERGY STAR, Attic Insulation Project (tips and safety considerations), retrieved .
Expert review
Written by the HyreRemodel Research team. Not yet reviewed by an outside expert. We say so rather than imply a review that has not happened; see our editorial policy.
How the numbers were checked: Code rules were read from 2021 IRC Sections R802.10.1 to R802.10.4 on ICC Digital Codes.
Truss parts, types, bearing and bracing descriptions come from SBCA’s roof truss terminology and truss configurations pages and its BCSI page; the standards role of TPI from the Truss Plate Institute site; attic safety from ENERGY STAR.
The truss drawing example lists the IRC’s required drawing items against an example project. No spans, loads or prices are given; truss design belongs to the truss engineer.
Suggest a correction. We fix errors and say what changed.